![ECR International Dunkirk DCB-100 Скачать руководство пользователя страница 20](http://html1.mh-extra.com/html/ecr-international/dunkirk-dcb-100/dunkirk-dcb-100_installation-operation-and-maintenance-manual_2356127020.webp)
16
4 - LOCATING BOILER
CAUTION
Boiler weight exceeds 140 pounds (63.5 kg). Do not
lift boiler onto wall without assistance.
!
!
4.3 Wall Mounting
1.
Decide position of boiler on the wall allowing for all
required clearances and flue terminal position.
2.
Tape template to the wall. Ensure template is level and
upright. Mark position of holes for boiler mounting bracket
and plumbing connections.
3.
Rear exit flue - mark position of hole for flue.
4.
Side exit flue - mark horizontal center line of flue across
the wall to side wall, then along side wall (ensure lines are
parallel and sloped properly towards the boiler, refer to
section 6. This will give position of center of hole for flue.
5.
Cut hole in wall for coaxial flue. See sizing below:
• 75, 100, 115, 125 & 150 - 4
3/8
" [110 mm] diameter
• 165 & 205 - 5
5/16
" [135 mm] diameter
6.
Pre-pipe supply and return water connections with factory
fittings before wall mounting.
7.
Mount boiler on wall using wall mounting bracket included
with unit.
8.
Adjust the position of the boiler verify it is level and plumb.
Note
Lift boiler using chassis. Do not use front jacket,
vent piping, water or gas fittings to lift boiler as it
may cause damage to the boiler.
Use two (2) wrenches when tightening and fitting
to pipe boiler's threaded fittings. Boiler's internal
piping can be damaged if subjected to excessive
torque.
Note
FIGURE 4-2 Wall Mount Bracket (Included)
Center brackets. Avoid
overhang on sides of
wall mount bracket.
Use four (4) predrilled
holes for mounting
bracket to wall
240013501 REV A [03/15/2022]
Содержание Dunkirk DCB-100
Страница 2: ...DCC 205...
Страница 4: ...DCB 165...
Страница 79: ...75 A 2 MODEL 75 100 Heat Only APPENDIX A WIRING DIAGRAMS 240013501 REV A 03 15 2022...
Страница 80: ...76 APPENDIX A WIRING DIAGRAMS A 2 MODEL 125 Heat Only 240013501 REV A 03 15 2022...
Страница 81: ...77 APPENDIX A WIRING DIAGRAMS A 3 MODEL 165 Heat Only 240013501 REV A 03 15 2022...
Страница 82: ...78 APPENDIX A WIRING DIAGRAMS A 1 MODEL 115 Combi 240013501 REV A 03 15 2022...
Страница 83: ...79 APPENDIX A WIRING DIAGRAMS A 4 MODEL 150 Combi 240013501 REV A 03 15 2022...
Страница 84: ...80 APPENDIX A WIRING DIAGRAMS A 5 MODEL 205 Combi 240013501 REV A 03 15 2022...
Страница 85: ...81 NOTES 240013501 REV A 03 15 2022...
Страница 86: ...82 NOTES 240013501 REV A 03 15 2022...
Страница 120: ...32 PN 240011430 REV Q 03 15 2022 CIRCULATOR CONNECTIONS WIRING DIAGRAM SINGLE ZONE CIRCULATOR WIRING USING ARGO AR822 II...
Страница 121: ...33 PN 240011430 REV Q 03 15 2022 75 100 HEAT ONLY WIRING DIAGRAM MODEL 75 100 HEAT ONLY...
Страница 122: ...34 PN 240011430 REV Q 03 15 2022 MODEL 125 HEAT ONLY 125 HEAT ONLY WIRING DIAGRAM...
Страница 123: ...35 PN 240011430 REV Q 03 15 2022 MODEL 165 HEAT ONLY 165 HEAT ONLY WIRING DIAGRAM...
Страница 124: ...36 PN 240011430 REV Q 03 15 2022 115 COMBI WIRING DIAGRAM MODEL 115 COMBI...
Страница 125: ...37 PN 240011430 REV Q 03 15 2022 MODEL 150 COMBI 150 COMBI WIRING DIAGRAM...
Страница 126: ...38 PN 240011430 REV Q 03 15 2022 MODEL 205 COMBI 205 COMBI WIRING DIAGRAM...
Страница 132: ...44 PN 240011430 REV Q 03 15 2022 LOW WATER CUTOFF DETAIL LOW WATER CUTOFF NO NO YES...
Страница 137: ...49 PN 240011430 REV Q 03 15 2022 3 FAULT SOLUTION SECTIONS...