![ECR International Dunkirk DCB-100 Скачать руководство пользователя страница 29](http://html1.mh-extra.com/html/ecr-international/dunkirk-dcb-100/dunkirk-dcb-100_installation-operation-and-maintenance-manual_2356127029.webp)
25
5.11 Twin Pipe Polypropylene Adapter Kit Installation
165/205 Boilers
[See Figures 5-15 through 5-17]
1.
Inspect Coaxial Connector on top of boiler. Confirm the
factory installed inner and outer gaskets are in place.
2.
Insert the Flue adapter (1) into the Coax connector, push
down firmly to fully seat it.
3.
Remove (3) screws securing the Fresh Air cover plate (2).
4.
Remove the gasket and discard.
5.
Install the Fresh Air inlet adapter and new gasket (3),
secure with 3 screws.
5.12 Twin Pipe CPVC Adapter Kit Installation
165/205 Boilers
[See Figures 5-11, 5-12, 5-17, 5-18 & 5-19]
1.
Inspect Coaxial Connector on top of boiler. Confirm the
factory installed inner and outer gaskets are in place.
2.
Insert the Flue adapter (1) into the Coax connector, push
down firmly to fully seat it. Figure 5-16
3.
Remove (3) screws securing the Fresh Air cover plate (2).
Figure 5-17
4.
Remove the gasket and discard.
5.
Install the Fresh Air inlet adapter and new gasket (3),
secure with 3 screws. Figure 5-17.
6.
Insert CPVC adapters into polypropylene flue adapters and
firmly seat. (4) Figures 5-18 & 5-19
5 - COMBUSTION AIR AND VENT PIPING
Figure 5-15 - Coaxial to Twin Pipe Adapter Kit
165-205 Model Boilers
Inner Gasket
Outer Gasket
Fresh Air Cover
Plate
Flue Adapter
(1)
Figure 5-16 - Coaxial to Twin Pipe Adapter Kit
165-205 Model Boilers
Figure 5-17 - Twin Pipe Polypropylene Adapter Kit
165-205 Model Boilers
Coaxial Connector
Fresh Air Inlet Adapter
Figure 5-19 - Twin Pipe CPVC Adapter Kit
165-205 Model Boilers
REMOVE
(2)
(3)
Figure 5-18 - Twin Pipe CPVC Adapter Kit
165-205 Model Boilers
CPVC Adapters
(4)
240013501 REV A [03/15/2022]
Содержание Dunkirk DCB-100
Страница 2: ...DCC 205...
Страница 4: ...DCB 165...
Страница 79: ...75 A 2 MODEL 75 100 Heat Only APPENDIX A WIRING DIAGRAMS 240013501 REV A 03 15 2022...
Страница 80: ...76 APPENDIX A WIRING DIAGRAMS A 2 MODEL 125 Heat Only 240013501 REV A 03 15 2022...
Страница 81: ...77 APPENDIX A WIRING DIAGRAMS A 3 MODEL 165 Heat Only 240013501 REV A 03 15 2022...
Страница 82: ...78 APPENDIX A WIRING DIAGRAMS A 1 MODEL 115 Combi 240013501 REV A 03 15 2022...
Страница 83: ...79 APPENDIX A WIRING DIAGRAMS A 4 MODEL 150 Combi 240013501 REV A 03 15 2022...
Страница 84: ...80 APPENDIX A WIRING DIAGRAMS A 5 MODEL 205 Combi 240013501 REV A 03 15 2022...
Страница 85: ...81 NOTES 240013501 REV A 03 15 2022...
Страница 86: ...82 NOTES 240013501 REV A 03 15 2022...
Страница 120: ...32 PN 240011430 REV Q 03 15 2022 CIRCULATOR CONNECTIONS WIRING DIAGRAM SINGLE ZONE CIRCULATOR WIRING USING ARGO AR822 II...
Страница 121: ...33 PN 240011430 REV Q 03 15 2022 75 100 HEAT ONLY WIRING DIAGRAM MODEL 75 100 HEAT ONLY...
Страница 122: ...34 PN 240011430 REV Q 03 15 2022 MODEL 125 HEAT ONLY 125 HEAT ONLY WIRING DIAGRAM...
Страница 123: ...35 PN 240011430 REV Q 03 15 2022 MODEL 165 HEAT ONLY 165 HEAT ONLY WIRING DIAGRAM...
Страница 124: ...36 PN 240011430 REV Q 03 15 2022 115 COMBI WIRING DIAGRAM MODEL 115 COMBI...
Страница 125: ...37 PN 240011430 REV Q 03 15 2022 MODEL 150 COMBI 150 COMBI WIRING DIAGRAM...
Страница 126: ...38 PN 240011430 REV Q 03 15 2022 MODEL 205 COMBI 205 COMBI WIRING DIAGRAM...
Страница 132: ...44 PN 240011430 REV Q 03 15 2022 LOW WATER CUTOFF DETAIL LOW WATER CUTOFF NO NO YES...
Страница 137: ...49 PN 240011430 REV Q 03 15 2022 3 FAULT SOLUTION SECTIONS...