Hydraulic installation
CAUTION!
When connecting the suction and pressure lines, make sure that the
O-rings (Fig. 10, pos. 5 and pos. 11) are installed on the connections to
obtain the necessary sealing effect.
We recommend that you use a suction lance from our product range.
linktarget
[417101964 11 Verschleiß-, Ersatzteile und Zubehör] doesn't exist but @y.link.required='true'
.
Fig. 10: Hydraulic installation
1
Complete metering line
2
O-ring pressure side (metering)
3
Pressure valve
4
Bleed screw
5
Metering head
6
Bleed connection
7
Ventilation hose (not in the scope of the delivery)
8
Suction valve
9
O-ring, suction-side
10 Tapered part
11 Clamping part
12 Union nut
13 Metering hose
Connection for the metering line
During pipe installation:
1.
Place the O-ring (Fig. 10, pos. 2) in the valve groove.
2.
Connect the prefabricated metering line to the output of the metering pump and to
the metering valve.
Installation
30
417101964 Rev. 4-04.2019
Содержание 141277
Страница 2: ......
Страница 60: ...12 1 Abmessungen Abb 25 Artikel Nr 141277 Abb 26 Artikel Nr 141278 Technische Daten 58 417101964 Rev 4 04 2019...
Страница 71: ...DN20 DN25 DN40 EMP Kompakt II Operating instructions EMP Kompakt II 417101964 Rev 4 04 2019 23 04 2019 ENGLISH...
Страница 127: ...12 1 Dimensions Fig 25 Article No 141277 Fig 26 Article No 141278 Technical data 57 417101964 Rev 4 04 2019...
Страница 137: ...67 417101964 Rev 4 04 2019...
Страница 139: ...DN20 DN25 DN40 EMP Kompakt II Manuel d utilisation EMP Kompakt II 417101964 Rev 4 04 2019 23 04 2019 FRANCAIS...
Страница 198: ...12 1 Dimensions Fig 25 Artikel Nr 141277 Fig 26 Artikel Nr 141278 Caract ristiques techniques 60 417101964 Rev 4 04 2019...