Wall mounting:
1.
Cut the enclosed hose to the appropriate length.
2.
Dismantle the connecting parts on the prefabricated metering line.
3.
Mount the connecting parts on the adapted metering hose.
4.
Mount the prefabricated metering line (Fig. 10, pos. 1).
5.
Place the O-ring (Fig. 10(pos. 2) in the valve groove and tighten the union nut
6.
Repeat the procedure on the metering valve.
Connection of the suction line:
1.
Cut the hose with straight across
2.
Push the union nut (Fig. 10, pos. 14) and clamping part (Fig. 10, pos. 13) over the
hose.
3.
Insert the union nut and clamping part up to the stop collar on the tapered part
4.
Place the O-ring (Fig. 10, pos. 11) in the valve groove.
5.
Tighten the union nut.
6.
Place the suction lance into the supply container.
6.4.2
Electrical installation
Overview:
Fig. 11: Electrical installation
I
Input for level pre-warning and empty signal
II
Input for the water meter pulse
III
Mains supply connection
Installation
31
417101964 Rev. 4-04.2019
Содержание 141277
Страница 2: ......
Страница 60: ...12 1 Abmessungen Abb 25 Artikel Nr 141277 Abb 26 Artikel Nr 141278 Technische Daten 58 417101964 Rev 4 04 2019...
Страница 71: ...DN20 DN25 DN40 EMP Kompakt II Operating instructions EMP Kompakt II 417101964 Rev 4 04 2019 23 04 2019 ENGLISH...
Страница 127: ...12 1 Dimensions Fig 25 Article No 141277 Fig 26 Article No 141278 Technical data 57 417101964 Rev 4 04 2019...
Страница 137: ...67 417101964 Rev 4 04 2019...
Страница 139: ...DN20 DN25 DN40 EMP Kompakt II Manuel d utilisation EMP Kompakt II 417101964 Rev 4 04 2019 23 04 2019 FRANCAIS...
Страница 198: ...12 1 Dimensions Fig 25 Artikel Nr 141277 Fig 26 Artikel Nr 141278 Caract ristiques techniques 60 417101964 Rev 4 04 2019...