34
Male eyebolt DIN580 M12
x4
Broad brimmed washer DIN9021
M12
x4
Hex nut DIN934 M12
x4
Drawing 6
Select appropriate slings to the weight of the boiler. (See specifications of the boiler).
Respect minimum elevation angle of the sling and verify proper load sharing between them.
Drawing 7
If the lifting is done without having removed the hopper assembly - boiler body, the hopper must be empty.
Attention!:
If the boiler is lifted in full, it will pitch. Lift carefully.
LOCATION AND SAFETY DISTANCES.
4.24.
Check the space between the boiler, the fuel, and any flammable material, check
drawing 8
.
4.25.
Do not install the boiler in a sleeping room.
4.26.
The power cable provided by
ECOFOREST
is 1.4m long; you might need a longer one.
Always
use a cable with
ground plug.
FREE SPACES AND MINIMUM DISTANCES WITH FLAMMABLE MATERIAL.
Содержание VAP 30
Страница 2: ...1 ...
Страница 125: ...124 8 ESQUEMA ELÉCTRICO ELECTRICAL DRAWING SCHEMA ELÉCTRIQUE SCHEMA ELETTRICO ESQUEMA ELÉCTRICO ...
Страница 127: ...126 10 MEDIDAS MEASURES MESURES MISURES MEDIDAS VAP 30 CG 00 04 UNE EN 303 5 ...
Страница 131: ...130 12 MEDIDAS MEASURES MESURES MISURES MEDIDAS VAP 38 CG 00 04 UNE EN 303 5 ...