38
5.
CLEANING AND MAINTENANCE.
To ensure the correct operation of your boiler, the following Cleaning and maintenance operations are
necessary at the indicated frequency. The boiler must always be cold.
The deterioration of the boiler parts by a lack of cleaning involves the loss of the two-year warranty offered
by
ECOFOREST
(see warranty section).
MAINTENANCE AT END OF SEASON OR AFTER AN ALARM MESSAGE (A036/A037)
.
This is necessary to ensure correct operation and maintain the stove’s life duration. When winter ends,
contact your provider (if he did not contact you) and meet to carry out this maintenance; the following shall be done
(the stove must always be disconnected from power):
Tools needed for cleaning and maintenance.
Drawing 15
5.1.
Ash box.
Empty the ash box at the end of the season or after an alarm message (see
User manual
). To remove the ash
box, you have to first take out the through bolt. Please check the capacity of the ash box in section
10
(
Technical characteristics
).
Once the ash box has been emptied, put it back into place.
Warning:
the ash extraction system won’t work as long as the ash box is not in its intended position or the
cover is open.
Drawing 16
Screw driver / allen wrench. 3, 4 and 5mm
Screw driver / Torx wrench. T20
Spanner.
7, 10 and 15mm
Cable / cord / wire.
L > 800mm
Cleaning brush
Vacuum cleaning
Exchanger cleaner.
Ash box
Four-point knob (box cover opening).
Through bolt.
Содержание VAP 30
Страница 2: ...1 ...
Страница 125: ...124 8 ESQUEMA ELÉCTRICO ELECTRICAL DRAWING SCHEMA ELÉCTRIQUE SCHEMA ELETTRICO ESQUEMA ELÉCTRICO ...
Страница 127: ...126 10 MEDIDAS MEASURES MESURES MISURES MEDIDAS VAP 30 CG 00 04 UNE EN 303 5 ...
Страница 131: ...130 12 MEDIDAS MEASURES MESURES MISURES MEDIDAS VAP 38 CG 00 04 UNE EN 303 5 ...