
MAINTENANCE
Only perform maintenance work on the XRGI
®
system when it is not in
operation and is fully cooled down! Otherwise, there is a risk of burns from
hot components and/or scalding if substances should escape.
REQUIRED MATERIAL
EC POWER service kit for XRGI
®
6 (
Item No.: 01KIT2611
) consisting of:
1 pc. exhaust gas compensator
1 pc. vacuum sensor
2 pcs. hose clamps
1 pc. vacuum filter
1 pc. air filter
1 pc. gasket valve cover
4 pcs. engine oil
3 pcs. spark plugs
2 pcs. zero pressure hose Ø2,0x1,5
1 pc. oil filter
1 pc. plug for measuring point
REQUIRED TOOLS
Engine oil suction pump
16 mm spark plug wrench
Oil filter spanner
17 mm socket insert
Torque wrench
10 mm socket insert
Water pump pliers
3 mm Allen screwdriver
Hose clamp pliers
5 mm Allen screwdriver
Funnel
10 mm ring spanner
Feeler gauge
24 mm ring spanner
FS2009USB programming device
10 mm open-ended spanner
Flue gas analyser
17 mm open-ended spanner
19 mm open-ended spanner
10 mm socket spanner
Before commencing maintenance work, shut down the XRGI
®
system at
the user level on the iQ-Control Panel and at the main switch. Close the
gas valve and unplug the Q-Heat Distributor.
4.
MAINTENANCE XRGI
®
6
Fig. 4.01
8