MAINTENANCE
Fig. 7.01
Only perform maintenance work on the XRGI
®
system when it is not in
operation and is fully cooled down! Otherwise, there is a risk of burns from
hot components and/or scalding if substances should escape.
REQUIRED MATERIAL
EC POWER service kit for XRGI
®
20 (Item No.:
01KIT2583
) consisting of:
1 pc. exhaust gas compensator
5 pcs. engine oil
2 pcs. hose clamps Ø47
1 pc. zero pressure hose Ø2,0x1,5
1 pc. hose clamps Ø21
1 pc. plug for measuring point
1 pc. foam gasket
1 pc. vacuum sensor
1 pc. injector
1 pc. vacuum filter
1 pc. lambda sensor
4 pcs. spark plugs
1 pc. air filter
1 pc. oil filter
EXTRA
1 pc. Power Wrap
1 pc. Rubber plug
REQUIRED TOOLS
Oil suction pump
Flue gas analyser
Oil filter spanner
Lambda sensor top long ½
Torque wrench
Retaining ring pliers
Water pump pliers
20.8 mm spark plug wrench
Hose clamp pliers
17 mm socket insert
Funnel
3 mm Allen screwdriver
Feeler gauge
5 mm Allen screwdriver
FS2009USB programming device
17 mm open-ended spanner
Before commencing maintenance work, shut down the XRGI
®
system at
the user level on the iQ-Control Panel and at the main switch. Close the
gas valve and unplug the Q-Heat Distributor.
7.
MAINTENANCE XRGI® 20
36