AORI
EN
67
www.eberg.eu
B. Remove the burrs
Remove the burrs with a deburring tool (bar), at the same time make sure that the abraded material does
not get into the pipe.
C. Put on suitable insulating pipe
D. Put on the union nut
Remove the union nut on the indoor connection pipe and outdoor valve; install the union nut on the pipe.
E. Expand the port
Expand the port with expander.
Note!
„A” is different according to the diameter, please refer to the sheet below:
Содержание AORI E25-09
Страница 69: ...eberg eu KARTA GWARANCYJNA URZA DZEŃ KLIMATYZACYJNYCH MARKI EBERG ...
Страница 74: ...Data przeglądu Pieczęć i podpis serwisu Uwagi adnotacje Przeglądy techniczne ...
Страница 75: ...Data naprawy Opis Pieczęć i podpis Punktu Serwisowego Naprawy ...
Страница 76: ...Climateo Sp z o o Kokotów 703 32 002 Kokotów biuro eberg eu tel 48 513 677 545 www eberg eu ...