CHECK AFTER INSTALLATION
Check according to the following requirement after finishing installation.
Items to be checked
Possible malfunction
Has the unit been installed firmly?
The unit may drop, shake or emit noise.
Have you done the refrigerant leakage test?
It may cause in sufficient cooling (heating)
capacity.
Is heat insulation of pipeline sufficient?
It may cause condensation and water drip-
ping.
Is water drained well?
It may cause condensation and water drip-
ping.
Is the voltage of power supply according to
the voltage marked on the nameplate?
It may cause malfunction or damaging the
parts.
Is electric wiring and pipeline installed correc-
tly?
It may cause malfunction or damaging the
parts.
Is the unit grounded securely?
It may cause electric leakage.
Does the power cord follow the specification?
It may cause malfunction or damaging the
parts.
Is there any obstruction in the air inlet and
outlet?
It may cause in sufficient cooling(heating)
capacity.
The dust and sundries caused during installa-
tion are removed?
It may cause malfunction or damaging the
parts.
The gas valve and liquid valve of connection
pipe are open completely?
It may cause in sufficient cooling(heating)
capacity.
Test operation
1.
Preparation of test operation
•
The client approves the air conditioner.
•
Specify the important notes for air conditioner to the client.
2.
Method of test operation
•
Connect the power, press „ON/OFF” button on the remote controller to start operation.
•
Press „MODE” button to select AUTO, COOL, DRY, FAN and HEAT to check whether the operation is
normal or not.
•
If the ambient temperature is lower than 16°C, the air conditioner can’t start cooling.
CONFIGURATION OF CONNECTION PIPE
1.
Standard length of connection pipe 5m, 7.5m, 8m.
2.
Min length of connection pipe
For the unit with standard connection pipe of 5m, there is no limitation for the min length of connection
pipe. For the unit with standard connection pipe of 7.5m and 8m, the min length of connection pipe is 3m.
3.
Max. length of connection pipe and max. high difference.
Содержание AORI E25-09
Страница 69: ...eberg eu KARTA GWARANCYJNA URZA DZEŃ KLIMATYZACYJNYCH MARKI EBERG ...
Страница 74: ...Data przeglądu Pieczęć i podpis serwisu Uwagi adnotacje Przeglądy techniczne ...
Страница 75: ...Data naprawy Opis Pieczęć i podpis Punktu Serwisowego Naprawy ...
Страница 76: ...Climateo Sp z o o Kokotów 703 32 002 Kokotów biuro eberg eu tel 48 513 677 545 www eberg eu ...