IMPORTANT: Two aluminum Rails are provided
with the INNI and will need to be shortened if the
drain has been cut. The Rails are NOT the same
height. The Drain Channel Rail (short) is labeled.
You can verify that the Rails are in the correct
locations if they are flush with the bottom of the
Drain Body.
Drill and Countersink for Rail Attachment Screws:
Use the Drill Guide, Countersink Guide, and Drill Bit
to make six countersunk holes through the Drain Body and Rails. Screws should be roughly placed at
each end and center of both Rails. Do not over-tighten the Screws.
Congratulations! Assembly is complete.
a
c
!
!
3. Install Stiffening Rails
Measure and Cut Rails:
Measure the distance between the End Sweeps and cut the Rails to length.
Both Rails should be the same length.
b
Clean Surfaces and Install Rails:
Clean the surfaces where the Rails will be mounted. Remove the
pink release liner from one Rail and forcefully install the Rail into position. Use a piece of wood
to push and rub along the length of the Rail to make sure it is completely seated. Repeat this
process for the opposite rail.
10
Drill Guide
Countersink
Guide
Drain Channel Rail
Main Channel Rail