97
02/11 MN05006002Z-EN
4
Commissioning
The commissioning of an SmartWire-DT network always
takes place in connection with the SmartWire-DT gateway
and the overriding controller (PLC) with its field bus connec-
tion.
Commissioning of the various SmartWire-DT gateways and
controllers are described in separate manuals.
• MN05013002Z-EN, „SmartWire-DT Gateways“
(previously AWB2723-1612en)
• MN05003001Z-EN
(previously AWB2724-1491GB)
Modular PLC XC-CPU201… (among other things with the
connection for the CANopen field bus)
• MN050020002Z-EN
(previously AWB2725-1452GB)
XI/OC signal modules (among other things with the
connection for the PROFIBUS DP field bus).
The manuals are available for download on the Internet as
PDF files.
They can be quickly located at
http://www.moeller.net/en/support
by entering the document number as the search term.
j
Danger!
Before the commissioning the SmartWire-DT system must
be completely mounted and wired.
www.comoso.com
Содержание SmartWire-DT
Страница 32: ...28 02 11 MN05006002Z EN www comoso com ...
Страница 50: ...46 02 11 MN05006002Z EN www comoso com ...
Страница 110: ...Commissioning 106 02 11 MN05006002Z EN www comoso com ...
Страница 122: ...118 02 11 MN05006002Z EN www comoso com ...