Installing Options and Accessories
5-4
Power Xpert
TM
9395 550/275 UPS (225–550 kVA) Installation and Operation Manual 164201716—Rev 8
www.eaton.com/powerquality
5.2
Installing Distributed Bypass Control Wiring
To install distributed bypass control wiring:
1.
Verify the UPS system is turned off and all power sources are removed. See Chapter 7, “UPS Operating
Instructions” for shutdown instructions.
2.
Perform the procedure listed in paragraph 5.1.
3.
Terminal block TB3 is accessible on the left side of the X-Slot communication bay (see Figure 4-12). To
gain access to terminal block TB1, TB2, and the left interface entry conduit landing plates, loosen the
screws securing the small top internal safety shield panel and remove the panel. This panel is to the right
of the X-Slot communication bay (see Figure 4-12). Retain the hardware for later use.
4.
Remove the interface entry conduit landing plates to drill or punch holes (see Figure 4-4).
5.
Reinstall the interface entry plates and install the conduit.
6.
To locate the appropriate terminals and review the wiring and termination requirements, see
7.
Route and install CAN wiring between the UPS cabinets. See Figure 5-2 and Table 5-1 for the Powerware
Hot Sync CAN Bridge Card terminal location and Figure 5-3, Figure 5-4, and Table 5-2 for wiring
information.
8.
If a tie cabinet with Module Output Breakers (MOBs) is being wired, proceed to Step 11; otherwise,
proceed to Step 9.
9.
Route and install distributed bypass system pull-chain wiring between the UPS cabinets. See Figure 5-5
and Table 5-3 on Table 5-3 for wiring information.
10. Proceed to Step 12.
11. Route and install distributed bypass system pull-chain wiring between the UPS cabinets and tie cabinet
MOBs. See Figure 5-6 and Table 5-4 for wiring information.
12. Reinstall the small top internal safety shield panel and secure with the cabinet mounted screws.
13. Close the front door and secure the latch.
14. If removed, reinstall the safety shield panel removed in paragraph 5.1, Step 5. Secure with the retained
hardware.
15. If removed, reinstall the left front panel removed in paragraph 5.1, Step 4 and secure with the retained
hardware.
NOTE
When installing external wiring to the Powerware Hot Sync CAN Bridge Card,
conduit must be installed to the UPS cabinet. When installing internal wiring to the
Powerware Hot Sync CAN Bridge Card terminals, route the wiring through the
internal opening in the X-Slot communication bay.
NOTE
When installing interface wiring for the pull chain, conduit must be installed
between UPSs.
NOTE
Setup of the Powerware Hot Sync CAN Bridge Card for parallel operation must be
performed by an authorized Eaton Customer Service Engineer. Contact an Eaton
service representative to schedule a date.
Содержание Power Xpert 9395 550/275
Страница 1: ...Power Xpert 9395 UPS 550 275 UPS 225 550 kVA Installation and Operation Manual...
Страница 2: ......
Страница 3: ...Power Xpert 9395 UPS 550 275 UPS 225 550 kVA Installation and Operation Manual...
Страница 27: ...Section 1 Installation...
Страница 28: ......
Страница 100: ...1 2 Power Xpert TM 9395 550 275 UPS 225 550 kVA Installation and Operation Manual 164201716 Rev 8...
Страница 207: ......
Страница 208: ...164201716 8 164201716 8...