UPS Operating Instructions
This section describes how to operate the UPS using either the older LCD non-touch panel or the newer color
touchscreen control.
Refer to Section 7.2 Using the LCD Control Panel or Section 7.5 Using the Color Touchscreen for the
appropriate item.This section describes how to operate the UPS.
7.1
UPS Controls and Indicators
The controls and indicators identified and described in this section are used to control and monitor UPS
operation. Figure 7-1 shows the controls and indicators.
Figure 7-1. UPS Controls and Indicators
NOTE
Before starting the UPS, ensure all installation tasks are complete and a preliminary
startup has been performed by authorized service personnel. The preliminary
startup verifies all electrical interconnections to ensure the installation was
successful and the system operates properly.
NOTE
Read this section of the manual and have thorough knowledge of UPS operation
before attempting to operate any of the controls.
NOTE
The UPS displays 2 minutes of battery runtime at the initial startup. After a 24-hour
charging period, the UPS automatically runs a battery test and the correct battery
runtime displays.
Control Panel
ISBM
UPM 1
AC Input Breaker CB1
(Optional)
(Not available with
separate rectifier feed
option.)
Содержание Power Xpert 9395 550/275
Страница 1: ...Power Xpert 9395 UPS 550 275 UPS 225 550 kVA Installation and Operation Manual...
Страница 2: ......
Страница 3: ...Power Xpert 9395 UPS 550 275 UPS 225 550 kVA Installation and Operation Manual...
Страница 27: ...Section 1 Installation...
Страница 28: ......
Страница 100: ...1 2 Power Xpert TM 9395 550 275 UPS 225 550 kVA Installation and Operation Manual 164201716 Rev 8...
Страница 207: ......
Страница 208: ...164201716 8 164201716 8...