13
Installation Guide
GREEN MOTION BUILDING PRO
www.eaton.com
Place charger
[A]
on mounting
plate
[C]
and insert retention
screws and rubber plugs .
Reference:
• EV charger
[A]
• Mounting plate
[C]
C
A
A
STEP C-5
Retention screws
Rubber plugs
L
K
Feed the 1” threaded plastic pipe nipple
[G]
through the larger hole and
use two 1” plastic nuts
[H]
and two 1” o-rings
[J]
to secure it on the
interior of the charger
[A]
and on the interior of the EV pedestal .
IF INSTALLING ETHERNET, secure the 1/2” threaded plastic pipe nipple
[K]
using a 1/2” plastic nut
[L]
on the interior of the charger
[A]
.
STEP C-6
STEP C-7
Run lineside wiring and
ethernet (ethernet is
optional) into the EV
charger
[A],
following
all local guidelines .
Reference:
• 1” threaded plastic pipe nipple
[G]
• 1” plastic nuts
[H]
- x2
• 1” o-ring
[J]
- x2
• 1/2” threaded plastic pipe nipple
[K]
• 1/2” plastic nuts
[L]
A
H
J
G
J
H
A
Lineside wiring
Ethernet