12
Green Motion Building Pro
GREEN MOTION BUILDING PRO
www.eaton.com
Remove the two 1/4”-20 Hex head bolts
[N]
, neoprene washers
[R]
,
and 1/4”-20
serrated flange nuts
[P]
from the cord
hook that came with the EV pedestal .
Install mounting plate
[C]
on the EV
pedestal using the four 1/4”-20 Hex head
bolts
[N]
,
neoprene washers
[R]
, and
1/4”-20 serrated flange nuts
[P]
.
With the removed hardware from the
basic cord hook, install the premium
cord holster
[D]
onto the pedestal with
the two 1/4”-20 Hex head bolts
[N]
,
neoprene washers
[R]
, and 1/4”-20
serrated flange nuts
[P]
.
STEP C-4
Reference:
• 1/4”-20 Hex head bolt
[N]
- x6
• Neoprene washer
[R]
- x6
• 1/4”-20 serrated flange nuts
[P]
- x6
• Mounting plate
[C]
• Premium cord holster
[D]
P
R
R
P
N
N
C
D
IF INSTALLING ETHERNET, feed the 1/2”
threaded plastic pipe nipple
[K]
through
the smaller hole and use one 1/2”
plastic nut
[L]
to hold it in place from the
pedestal interior . Feed a 1/2” o-ring
[M]
on the exterior end .
Reference:
• 1/2” threaded plastic pipe nipple
[K]
• 1/2” plastic nuts
[L]
• 1/2” o-ring
[M]
STEP C-3
N,R,P
K
L
M