10
Green Motion Building Pro
GREEN MOTION BUILDING PRO
www.eaton.com
A
Screws
Lower front
panel
STEP B-5
Replace the lower front panel of the EV charger
[A]
using two screws .
BEFORE ENERGIZING EV CHARGER, RE-CHECK ALL ELECTRICAL CONNECTIONS
AFTER ALL WIRING HAS BEEN COMPLETED.
Reconnect power to the upstream circuit by switching circuit breaker to the ON position .
Energize the loadcenter or the panelboard . The EV charger
[A]
electronics should power
immediately, and the LCD will indicate the status of the charger .
Installation is complete. Turn to page
19 to commission the EV charger.