![Eaton Green Motion Building Pro Скачать руководство пользователя страница 8](http://html1.mh-extra.com/html/eaton/green-motion-building-pro/green-motion-building-pro_installation-manual_4350911008.webp)
6
Green Motion Building Pro
GREEN MOTION BUILDING PRO
www.eaton.com
Screws
For EXTERNAL CONDUIT INSTALLATION, punch
out the larger knockout hole as pictured . Only
punch out the smaller knockout if you plan to install
ethernet . Do not reinstall lower front panel .
STEP A-3
STEP A-4
For REAR INSTALLATION (PEDESTAL INCLUDED),
punch out the larger knockout hole as pictured . Only
punch out the smaller knockout if you plan to install
ethernet . Do not reinstall lower front panel .
For ethernet
For rear installation
Steps A4 through A6 are
OPTIONAL if you would like to
replace Eaton provided SIM card
with a different SIM card .
Remove the upper front panel of
the charger by loosening eight
screws . Set aside for later .
Upper front panel
OR
For external conduit
installation
For ethernet