![Eaton Green Motion Building Pro Скачать руководство пользователя страница 18](http://html1.mh-extra.com/html/eaton/green-motion-building-pro/green-motion-building-pro_installation-manual_4350911018.webp)
16
Green Motion Building Pro
GREEN MOTION BUILDING PRO
www.eaton.com
D
Mount a second EV charger to a pedestal
Remove the bracket and NEMA plug from
the top panel . Only remove the second
NEMA plug if you intend to connect the
EV charger to ethernet .
STEP D-1
Reference:
• Mounting plate
[C]
• 1/2” o-ring
[M]
• 1/4”-20 Hex head bolt
[N]
- x3
• Neoprene washer
[R]
- x3
• 1/4”-20 serrated flange nuts
[P]
- x3
Install the mounting plate
[C]
to the top
panel using the top three holes with 1/4”-
20 Hex head bolts
[N]
, neoprene washers
[R]
, and 1/4”-20 serrated flange nuts
[P]
.
IF INSTALLING ETHERNET, place 1/2”
o-ring
[M]
between the mounting plate
[C]
and the top panel and align it with
the ethernet through holes .
R
N
P
C
Bracket
NEMA
plug
NEMA
plug
(Ethernet)
Top panel
M