5
Installation Guide
GREEN MOTION BUILDING PRO
www.eaton.com
A
Prepare the EV Charger(s)
Reference:
• Mounting plate
[C]
Remove four rubber
plugs . Then, remove
four retention screws
and mounting plate
[C]
.
Set all aside for later .
STEP A-1
Size Upstream Circuit Breaker
Green Motion Building Pro allows users to select the output current through the LCD interface.
You can access
this selection through the LCD’s Admin menu that is password protected .
Log into “Admin Menu
→
System
Settings
→
General Settings” to access this setting. Default password to access Admin settings is ‘eaton’. Users
will be required to update to a stronger password.
Table below provides Circuit Breaker rating required for each output current option available . Complete the de-rating
label provided and affix to the side of the EV charger .
!
CAUTION: To avoid any damage, do not attempt to charge an electric vehicle until you validate the
output current setting through the LCD and Circuit Breaker rating per table above.
Output current setting
Circuit Breaker rating
32A(7 .7kW)
40A
40A(9 .6kW)
50A
48A(11 .5kW)
60A
Rubber plugs
Remove two screws to
remove the lower front
panel of charger . Set
aside for later .
STEP A-2
C
Lower front panel
Screws
Retention screws