![Eaton DV2-C16-3 Series Скачать руководство пользователя страница 89](http://html1.mh-extra.com/html/eaton/dv2-c16-3-series/dv2-c16-3-series_installation-and-operation-manual_3839492089.webp)
Appendix E
Checklists
Copyright © 2008-2009 Eaton Corporation. All Rights Reserved.
IPN 997-00012-71B July 2009
83
A
p
p
e
n
d
i
x
E
Checklists
Starting up Records Checklist
The following table provides a checklist guideline for recording information about starting
up Core Power Solutions.
Configuration Printout and updates (see Note below)
Configuration changes signed off by customer
Configuration changes noted in the Configuration Printout log
Installer’s checklists completed and returned to your Powerware dc product
representative
Installation Starting up Record is completed and returned to your Powerware dc
product representative
Copy of Installation Starting up Record handed to Customer
Customer keeps copy of completed handover/acceptance checklist
Copy of acceptance checklist retained at site (in the Configuration Printout
folder)
Formal acceptance in writing to your Powerware dc product representative
Note:
1
The Installer to upload and store the supervisory module configuration file using a PC
with the ICE Configuration Editor software.
2
Mark any differences in the Configuration Printout for the system, or reprint the full
configuration and place this in the Configuration Printout folder. If the supervisory
module’s configuration is incorrect, you can download the correct configuration, which
is available from your Powerware dc product representative or make any necessary
changes via supervisory module front panel or DCTools.
3
For more details, see Configuring the dc power system.
4
For details on using ICE, see the on-line help file (press F1).