DC Cabling
Copyright © 2008-2009 Eaton Corporation. All Rights Reserved.
IPN 997-00012-71B July 2009
25
Step 4 - Connect cables
1
Connect the live (negative) cables to the circuit breaker terminals.
2
Connect the common (positive) cables to the common bar.
Step 5 - Check terminations, secure cables and test insulation
1
Check all terminations are correct and tighten to:
•
1/4" studs:
3.9 - 4.5Nm (35 - 39 inch-pounds)
•
3/8" studs:
18.7 - 21.9Nm (166 - 194 inch-pounds)
2
Secure the cables with cable ties to ensure there will be no strain on the
terminals.
3
Test the insulation resistance of the cables.
Step 6 - Refit panels and covers
1
Refit the cabinet panels.
2
Refit the circuit breaker cover.
Fit blank covers over any unused circuit breaker positions.
3
Leave the circuit breakers in the off position and close the hinged front
cover until ready to start the dc power system.
Procedure complete