Duraforce HMR Conversion Procedures Manual E-MOPI-TM005-E July 2012
Content
Page #
Table of Contents
Tools Required
2
Introduction
3
Model Code
4
Block the Case Flushing Feature
Set Up
5
Procedure to Disable the Shuttle Valve Assembly
6
Procedure to Disable the Purge Valve
8
Exchange Purge Valves
Set Up
9
Procedure to Exchange a Close Loop Purge Valve with an Close Loop Purge Valve
9
Procedure to Exchange an Open Loop Purge Valve with a Open Loop Purge Valve
9
Exchange Shuttle Valve Assemblies
Set Up
10
Disassembly Procedure
11
Assembly Procedure
12
Exchange Displacement Override Blocks
Set Up and Procedure
13
Exchange Controls
Set Up and Procedure
14
Exchanging Response Orifices
Set Up and Procedure
15
Maximum Displacement Adjustment
Set up and Procedure
17
Minimum Displacement Adjustment
Set up and Procedure
18
Adjust Crossover Relief
Set up and Procedure
19
Operational Parameters
20
Part Numbers Listing
22
Blocking the Case
Flushing Feature
• 12mm Allen wrench
• 13mm Wrench (for Closed
Loop Purge Valve)
• 17mm Wrench (for Open Loop
Purge Valve)
• Torque wrench capable of
setting 122 N-m (90 ft-lb)
• Needle-nose pliers
• Blocked Purge Valve
• Rubber Mallet (optional)
• Disabled Shuttle Spool
Exchanging Purge
Valves
• 13mm wrench
• 17mm wrench
• Torque wrench capable of
setting 15 N-m (11 ft-lb)
Exchanging Shuttle
Valve Assemblies
• 12mm Allen wrench
• Heat gun / torch
• Eaton shuttle assembly tool
• Green Loctite 648
• Torque wrench capable of 100
ft-lb (136 N-m)
Exchanging Displacement
Override Blocks
• 3mm Allen wrench
• Torque wrench capable of
setting 3.8 N-m (2.8ft-lb)
Tools Required