![Eaton CEAG LP-STAR Скачать руководство пользователя страница 38](http://html1.mh-extra.com/html/eaton/ceag-lp-star/ceag-lp-star_mounting-and-operating-instructions_3833622038.webp)
38
Mounting and operating instructions compact emergency power supply CEAG LP-STAR
40071860247 (L) September 2018 www.ceag.de
7 Operating
Overview:
Main menu
Test & Statusmenu
Block & Reset Alarms
Basic setup
Circuit setup
Luminaire setup
Logbooksetup
Send ServicePinMsg
Menu 3
Language
Date & Time
Functiontest
Durationtest
Delaytime Mains Ret.
Manual reset
Relay setup
Buzzer setup
Display setup
Charger setup
Webserver-Setup
Timer setup
Group device Setup
Connection to BMS
Function keys
Optional input
Serialnumber & Type
Password protection
Daylight saving time
Service info
Selection of the
menu points
with the keys
<ok>:
confirm
selection
<Menu>: Exit
and return to
previous menu
(with input of
any changes
made)
<ESC>: Exit
and return to
previous menu
(without input
of any changes
made)
flashing input
prompt
Determine for which systems and/or error
messages the relays 1 to 4 switch for
the signal contacts 1 to 4 (switch status
“switched” and “non-switched”).
Using these settings it is possible for
information on the system operating status
to be transmitted to a control system (e. g.
with CEAG F3 remote display).
Standard settings in accordance with DIN
VDE (see Appendix A) can be entered using
the “Load default values” option at the end
of this menu.
Select the relay no. (1 to 4) with the
keys
Select the events with the keys
Selection between relay switches (
)
and relay does not switch (no
) with
<ok>
Exit and return to Menu 3 with
<Menu>
Note:
Also see menu point 1.9 “Relay-state” in
Menu 1”Test & Statusmenu”.
Delaytime Mains
Ret.
Manual reset
Selective
emergency light
Relay setup
etc. ...
Relay:
3
Mains operation
Mains failure
Mains failure subDB
Charging failure
Circuit failure
Luminaire fault
Sum failure
DeepDischargeProtect.
Isolation failure
Functiontest
Durationtest
DB-FÜB
Device failure
Invert relaycontact
Load default values
<ok>
Menu 3.7:
Activation or deactivation of the “Manual
Reset” option
(see Menu 2.3 “Manual Reset”)
Switch between “activated” and
“deactivated” with
Exit and return to Menu 3 with
<Menu>
Manual reset
deactivated
<ok>
Menu 3.6:
Functiontest
Durationtest
Delaytime Mains
Ret.
Manual reset
etc. ...
Determine for which systems and/or error
messages the buzzers installed in the
control cabinet will be activated.
Standard settings in accordance with DIN
VDE (see Appendix A) can be entered using
the “Load default values” option at the end
of this menu.
Select the events with
Select either buzzer ”
O
n
” (
) or
buzzer “
O
ff
” (no
) with the keys
Exit and return to Menu 3 with
<Menu>
NOTE!
The continuous signal (following the
occurrence of the event determined here)
can be switched off by clicking on any
button.
Buzzer setup
Mains operation
Mains failure
Mains failure subDB
Charging failure
Circuit failure
Luminaire fault
Sum failure
DeepDischargeProt.
Isolation failure
Functiontest
Durationtest
DB-FÜB
Device failure
Load default values
<ok>
Menu 3.8:
Manual reset
Selective
emergency light
Relay setup
Buzzer setup
etc. ...