27
Mounting and operating instructions compact emergency power supply CEAG LP-STAR
40071860247 (L) September 2018 www.ceag.de
5 Setting up and installation
5 .4 CEAG 3-PM Module with 24V current
loop
Connection is made via the connecting terminal X 501
(S3 and/or S4).
Block diagram for a CEAG 3-PM Module with a 24V
current loop for the requirements of emergency
lighting with differential loop monitoring to identify
short-circuits and wire breakages
Block diagram for the connection of several CEAG
3-phase monitors
CEAG 3-PM Module
NOTE!
If several sub-distributors are being monitored, more devices
must be connected and switched on with the other devices
in a 24 V loop.
If fewer than 3 phases are monitored by a 3-phase monitor,
the excess entries for the 3-phase monitor must be bridged.
5 .5 Completion of assembly
• Finally check all the connections that have been carried out
against the on-site plans and drawings for the installation.
• Check that all the connections are tight.
• Remove all cabling, insulation and mounting materials
that have not been used as well as all tools and packaging
materials.