5 Setting up and installation
5 .2 Mains connection
As in practice one part of the emergency lighting is often
not switched to maintained light, the mains surveillance of
the general lighting is guaranteed at the same time via the
3-phase supply of the LP-STAR devices without the need
for additional external phase monitoring relays. However,
the supply of the emergency lighting circuit is carried out
on a 1-phase basis.
IP 20 Version
F1-0 2,5A
T F2-0 2,5A
T F3-0 2,5A
T F4-0 2,5A
T
F1-U 2,5A
T F2-U 2,5A
T F3-U 2,5A
T F4-U 2,5A
T
1
3
1
Connecting terminal
L3/FE*/L2/N/L1.
2
Protective conductor connecting bar
3
Safeguarding mains voltage
* FE = Funktional earth, factory-
wired
NOTE!
For 1-phase operations only an on-load current cable L1 and
the input terminals are connected.
L1, L2 and L3 must be bridged syndetic.
Please install a circuit breaker with min. 10 A and charakteristik
K (according to DIN EN 60947-2) or alternatively a fuse with
melting integral > 200 A²s for the power cable.
Please note: The circuit breaker or fuses must also have a
separator function for the power cable. Easily accessibility
is necesary.
Please connect the protective earth of the mains cable to
the protective earth-connection bar.
+
-
+
-
+
-
+
-
+
-
+24V
CG-S
Optionale Eingänge
Controller
CSU
3-Phasen-
Überwachung
3/N/PE
CM4-24
U
N
L
B+
B-
B+
B-
24V DC
220V DC
X501
CGVision
UH+
UH+
UH-
UH-
CG-S-B
CG-S-B
CG-S-A
CG-S-A
Rel. 1
Rel. 2
Rel. 3
Strang 1
Strang 2
Strang 3
Strang 4
Rel. 4
11
12
14
21
22
24
31
32
34
41
42
44
S1
S2
S3
S4
L-DLS1
N-DLS1
L-DLS2
N-DLS2
L-DLS3
N-DLS3
L-DLS4
N-DLS4
L-DLS5
N-DLS5
L-DLS6
N-DLS6
L-DLS7
N-DLS7
L-DLS8
N-DLS8
X101
X100
PE
X102
Schutzleiter-Anschlussschienen
CNV
t
L3
FE
L2
N
L1
U1
01
U2
02
U3
03
U4
04
2
2
IP 54/ESF30 Version
1
Connecting terminal L1, L2, L3, N
2
Protective conductor
connecting terminals
3
Switch disconnector
1
2
3
Input Battery
Input Battery
Input Battery
Input Battery
Fuse
Fuse
Fuse
Fuse
+
+
+
+
-
-
-
-
Only Use CEAG Spare Parts
String 1
String 2
String 3
String 4
Reparatur- und Wartungsarbeiten
dürfen nur von geschulten
Elektrofachkräften durchgeführt werden.
Das Abschalten der allgemeinen
Stromversorgung bedeutet keine
Sicherheit für Wartungszwecke.
Anlage blockieren,
Sicherung und Stecker
nur im stromlosen Zustand entfernen
Bedienungsanleitung beachten
refer to instruction manual
Block system,
remove fuse and connectors only
when current is off
Gleichspannung
DC-Voltage
Achtung!
Repair and maintenance are only
to be done by qualified persons.
Insulation of the normal supply
to the equipment does not ensure
safety for maintenance purposes.
Warning!
CEAG
Made in Germany
Notlichtsyteme GmbH
D-59494 Soest
CEAG LP-STAR UNIT
40071361110
Zur
Ve
rw
endung in
Anla
ge
n nach EN 50
17
2
ge
eignet.
Modified f
or use in elect
ri
cal installations acc.
to
EN 50
172
ДЕ 0 1
Production Date: ww/yyyy Rev. Level: X
Software / Rev. Level: Z270 / XX
max. ambient temperature: -5 °C / +35 °C
Protection category: IP20
INPUT:
Rated voltage AC: 1~220-240 V; 50/60 Hz
max. rated current AC: 5.5 A
Rated voltage DC: 19.2 -28.8 V
Battery: VRLA, 2x6 cells in series, 20°C
OUTPUT:
Rated voltage: 220-240 V AC / 220 V DC (const.)
Total current: 4.7 A AC / 2.45A DC
Total power: 1080 VA / 540 W
Circuit power: 345VA / 330 W
FUSES:
Rated breaking capacity: 1500 A@300 V DC
max. permissible load fuse: 1.6 AT / I²t < 4.35A²s
operating times at rated load:
12 Ah
24 Ah
36 Ah
48 Ah
1 h 133 W
303 W
468 W
540 W
2 h
50 W
142 W
232 W
320 W
3 h
24 W
86 W
149 W
212 W
2,5AT
2,5AT
2,5AT
2,5AT
2,5AT
2,5AT
2,5AT
2,5AT