49
ZD17,ZD18,ZD19,ZD20,ZD21,
ZD22,ZD23,ZD24,ZD25,ZD26,
ZD27,ZD28,ZD29,ZD30,ZD31,
ZD32,ZD33,ZD34,ZD35,ZD36,
ZD37,ZD38,ZD39,ZD40,ZD41
Boost diode
D1,D2,D3,D4,D5,D6
RHRP3060
MM30FU60K
Fig.6-3 Key components identification of 15kVA power board
The detailed maintenance steps are as follows:
Step 1: Check whether the copper foil is corroded and rusted on the whole power board. You can use a
multimeter to assist in the inspection. If there is corrosion, the copper foil needs to be re-soldered.
Step 2: Visually inspect the entire power board for obvious burns or cracks, and replace if necessary.
Step 3: Use the diode gear of the multimeter to detect the PIN1(+)-PIN3(-) and PIN2(+)-PIN3(-) of the boost
IGBT and the inverter outer/inner bridge IGBT. If the multimeter shows that the voltage drop is too low (less than
0.1V), you need to replace the corresponding IGBT.
Note: When replacing the IGBT, it is necessary to apply heat dissipation paste on the back of the IGBT. If the
corresponding insulating gasket is blackened, burned, burned through, burned, etc., it should also be replaced
together.
Step 4: Use the multimeter diode gear to detect the Zenner diode of IGBT driver. If the multimeter shows that
the voltage drop is too low (less than 0.1V), the corresponding Zener diode needs to be replaced.
Note: If the IGBT is found to be damaged in step 3, the corresponding driving Zener diode will also be
damaged.
Содержание EA990G5
Страница 4: ...7 1 Boards installation 72 7 2 Preparation before power on 72 7 3 Power on and testing 72...
Страница 9: ...5 Fig 2 5 The rear pannel of 30kVA UPS Tower Fig 2 6 The rear pannel of 10kVA 15kVA 20kVA UPS Rack...
Страница 43: ...39 Fig 5 9 The left side board of 15kVA standard model Tower Fig 5 10 The board of 15kVA model Rack...
Страница 48: ...44 Fig 5 19 The left side board of 30kVA standard model Tower...