46
BQMS Installation Manual
052319
6.0 Initial Power Up
After the installation of the BQMS hardware is completed, the unit can be powered on. Prior to
powering on the unit for the first time, double check the following items:
1.
All clamps are connected in the correct order per the Cable Map.
2.
All cables are connected in the proper sequence per the Cable Map.
3.
The CT clamp is facing the correct direction.
4.
All voltages have been verified from the Sensing Cables, including current, voltage, and total
voltage.
5.
All Modules are connected in the correct order and are powered on.
To power on the BQMS, flip the power switch to the on position, the power LED on the front of the unit
should illuminate.
Each Module has an independent power switch that will need to be turned on.
WARNING:
Failure to check the voltages of each sensing cable can result in permanent
damage to the Modules. Ensure that all voltages are correct before powering on.