
41
BQMS Installation Manual
052319
5.
Next check the voltage of the first current harness I1.
6.
Connect the positive lead of the meter to the pin with the red wire and the negative lead to
the pin with the blue wire.
7.
The voltage displayed should match the voltage displayed in Fig. 6.1.
Voltage of Cells 1-4 Tested by Measuring the Red and Blue Wires
TIP:
To troubleshoot incorrect voltages, refer to the BQMS Maintenance Guide.