5. Hardware Installation
This section will provide the correct workflow for installing the BQMS Battery Monitoring System and all
of its components.
All necessary cables and clamps are provided at correct quantities and lengths based on information
provided from the Site Survey. Please be sure to have all the necessary tools and parts listed in
Section 3 and 4.
5.1 Overview of Workflow
The following is an overview of the complete workflow of what needs to be done on-site for the BQMS
Installation.
1. Mount BQMS CCU
2. Install Clamps to battery connections
3. Install Sensing Cables
4. Install Temperature Sensors
5. Check & mount Modules
6. Connect Total Voltage Cable and power connections
7. Install CT
8. Verify all connections
9. Power on Modules and CCU
10. Configure BQMS CCU IP address
11. Check measured parameters and resistance compensation
12. Connect BQMS to network
NOTE:
This guide should be used as an outline for installation, however it does not cover
every aspect of installation step-by-step. It is recommended that experienced personnel
familiar with electrical work and battery-room environments perform this installation. If a
section of this guide is unclear, please contact Eagle Eye Power Solutions directly for further
support.