Installation, Operation and Parts Manual
EE-6435BWF
32
S/N
Components
Methods
Period
7
Hydraulic valves
Remove the motor housing.
Inspect if any valve leaks. Clean or change the valve if it leaks.
Every 3 months
8
Electrical terminals
Open the control box to inspect all wire terminals. Screw firm if
any terminal connection is loose.
Every 3 months
9
Limit switch of the "out of level
“protection unit
Take off the protection covers fixed at both ends of the
crossbeam. Push the UP button and meanwhile use suitable
means to activate one of the limit switches. The lift must stop
rising when the limit switch is activated.
Every 3 months
10
Steel cables
Lubricated with NO.1 lithium grease.
Change with new steel ropes every 2 years or ten single wires
have broken.
Every 3 months
11
Pulley
Lubricated with NO.1 lithium grease.
Replace with new pulley in the case that:
1) Surface cracks
2) Uneven slot: bigger than 3mm
3) Over-wearing. 20% of pulley slot is abraded
Every 3 months
12
Shaft of the pulley
Add grease.
Every 3 months
Sliding blocks
Add grease.
Every 3 months
Whole lift
Running the lift for several cycles with and without rated load.
The lift can run steadily and smoothly with no abnormal noise.
Every 3 months
Hydraulic oil
Change the oil 6 months after initial use and once per year
thereafter. Inspect the hydraulic oil and change the oil if the oil
becomes black or there is dirt in the oil tank.
Every year
Additional care shall be paid to the painting surface so as to maximally avoid rust to steel mechanical structures.
1. Avoid rubbing against the paint surface with sharp and hard metal components.
2. Keep overheated light source away from the paint surface.
3. Keep the paint clean and dry, and remove in time the salty substance, snow and water from the paint surface. If there is water gathered
in the gap of the platform, it has to be wiped up and dried as soon as possible.
4. The oil contaminated paint surface can be cleaned with ordinary household cleaning agent. Corrosive solvent, detergent powder or
metal wire cleaning tools shall not be used. Soft fabrics like cotton gauzes and soft towels are recommended to wipe the paint surface.
5. Check the paint surface regularly. Deep scratches or peelings must be repaired in time, otherwise, due to the infiltration of water,
oxidation and rust will be accelerated. Epoxy paint is recommended for the repair.
6. Wax regularly.
If users stick to the above maintenance requirements, the lift will always keep a good working condition
and its service life could be extended.
Содержание EE-6435BWF
Страница 33: ...Installation Operation and Parts Manual EE 6435BWF 33 Annex 1 Steel cable connection...
Страница 34: ...Installation Operation and Parts Manual EE 6435BWF 34 Annex 2 Electrical schemes and parts list...
Страница 35: ...Installation Operation and Parts Manual EE 6435BWF 35...
Страница 36: ...Installation Operation and Parts Manual EE 6435BWF 36...
Страница 37: ...Installation Operation and Parts Manual EE 6435BWF 37...
Страница 52: ...Installation Operation and Parts Manual EE 6435BWF 52...
Страница 53: ...Installation Operation and Parts Manual EE 6435BWF 53...