Installation, Operation and Parts Manual
EE-6435BWF
13
INSTALLATION INSTRUCTIONS
4.1 Preparations before installation
4.1.1 Space requirements.
Refer to 3.3 for the dimensions of the lift. There must also be a clearance of at least 0.6 meter between the lifting platform and fixed
elements (e.g. wall) in all lifting positions. There must be sufficient space at the ends of the lifting platform for driving vehicles on and off.
To stop vehicles colliding with the ceiling, it is advisable to fit an overhead light barrier in low ceiling buildings.
4.1.2 Foundations and connections
The user must have the following work performed before erecting the lift.
Construction of the foundation following consultation with the manufacturer’s customer service or an authorized service agent.
Routing of the wiring to the installation location.
The user must provide fuse protection for the connection.
Electrical system
connection must be done by qualified electricians.
Requirements for power supply cable of the installation site: at least 2.5mm
2
wire core for 3Ph power and 4.0mm
2
wire core for 1Ph power.
Foundations preparations
Indoor installation only.
There must also be a clearance of at least 0.6 meter between the lifting platform and fixed elements (e.g. wall) in all lifting positions.
There must be sufficient space for driving vehicles on and off.
C20/25 concrete foundation with a minimum thickness of 200mm.
Содержание EE-6435BWF
Страница 33: ...Installation Operation and Parts Manual EE 6435BWF 33 Annex 1 Steel cable connection...
Страница 34: ...Installation Operation and Parts Manual EE 6435BWF 34 Annex 2 Electrical schemes and parts list...
Страница 35: ...Installation Operation and Parts Manual EE 6435BWF 35...
Страница 36: ...Installation Operation and Parts Manual EE 6435BWF 36...
Страница 37: ...Installation Operation and Parts Manual EE 6435BWF 37...
Страница 52: ...Installation Operation and Parts Manual EE 6435BWF 52...
Страница 53: ...Installation Operation and Parts Manual EE 6435BWF 53...