Installation, Operation and Parts Manual
EE-6435BWF
16
S/N
Name
Qty
16
Hex head full swivel screw M12*30
4
17
Hex socket flat head screw M12*80
8
18
Hex head full swivel screw M10*35
4
19
Hex socket button head screw M8*16
20
20
Spring washer Ø 10
4
21
Hex nut M10
4
22
Hex nut M12
4
23
Hex nut M20
12
24
Cotter pin 2.5*30
4
25
Flat washer Ø 10
4
26
Flat washer Ø 8
20
27
Anti-shock pad
4
28
Cross socket cap head screw M4*14
2
29
Manual
1
30
Drive-on ramp
2
4.2 Installation attentions
4.2.1 Joints of oil hose and wiring must be firmly connected in order to avoid leakage of oil hose and looseness of electrical wires.
4.2.2 All bolts should be firmly screwed up.
4.2.3 Do not place any vehicle on the lift in the case of trial running.
4.3 General installation steps
ONLY TRAINED AND QUALIFIED INSTALLERS CAN PERFORM LIFT INSTALLATION DUTIES.
Step 1: Ascertain the layout dimensions.
Mark the four positions for base plate of the four posts by a tape measure and chalk.
Ensure two diagonal lines are of the same length.
Содержание EE-6435BWF
Страница 33: ...Installation Operation and Parts Manual EE 6435BWF 33 Annex 1 Steel cable connection...
Страница 34: ...Installation Operation and Parts Manual EE 6435BWF 34 Annex 2 Electrical schemes and parts list...
Страница 35: ...Installation Operation and Parts Manual EE 6435BWF 35...
Страница 36: ...Installation Operation and Parts Manual EE 6435BWF 36...
Страница 37: ...Installation Operation and Parts Manual EE 6435BWF 37...
Страница 52: ...Installation Operation and Parts Manual EE 6435BWF 52...
Страница 53: ...Installation Operation and Parts Manual EE 6435BWF 53...