Installation, Operation and Parts Manual
EE-6435BWF
23
Secondly, align the level at four corners of the runway when mechanical safety locks are engaged.
Push the up button until the runway stays at a height about 800mm over the floor. Push the LOCK button to park the runway.
Measure at the four corners of the runway to see if the height are almost the same. Check with a tape measure. The deviation of the liquid
level shall be within 5mm. In case the deviation exceeds 3mm, correspondingly adjust the nuts (NO.41) attached with safety ratchet over
the top plate of the post until the deviation is controlled within 3mm.
Attention: In case of poor foundation level, you will not be able to control the deviation through making the above adjustment. In this case
you have to place equalizing plates (NO.42) under the base plate to ensure the verticality of each post.
Step 13: Make proper adjustment to the switches of the cable slack protection system.
Park the runway at a height about 800 mm above the foundation. Adjust the switches using hex socket spanner with a specification of
3mm. See the flowing fig. to get the advised scope for adjustment.
Содержание EE-6435BWF
Страница 33: ...Installation Operation and Parts Manual EE 6435BWF 33 Annex 1 Steel cable connection...
Страница 34: ...Installation Operation and Parts Manual EE 6435BWF 34 Annex 2 Electrical schemes and parts list...
Страница 35: ...Installation Operation and Parts Manual EE 6435BWF 35...
Страница 36: ...Installation Operation and Parts Manual EE 6435BWF 36...
Страница 37: ...Installation Operation and Parts Manual EE 6435BWF 37...
Страница 52: ...Installation Operation and Parts Manual EE 6435BWF 52...
Страница 53: ...Installation Operation and Parts Manual EE 6435BWF 53...