Installation, Operation and Parts Manual
EE-6435BWF
25
3. Mount the drive-on ramp (NO.53) onto the rear end of each lifting platform using pin shafts (NO.54) and cotter pins (NO.55).
Step 17: Level the wheel free lift
1. Turn on the power switch and turn the selection switch to the “main lift”. Push the “UP “button until the platform of the main lift rises
about 1 meter above the ground. (This is to find the levelling valve under the secondary platform of the main lift)
2. Find the valve under the secondary platform of the main lift and turn its handle making it point to the floor.
3. Turn the selection switch to the “wheel free lift” and push the UP button until the secondary platform of the wheel free lift starts to rise.
4. Turn the handle of the valve to its default position (with handle in the direction showing in the above picture) and push the UP button
until the two platforms of the wheel free lift are at the same level.
5. Normally, platforms of the wheel free lift are synchronized after step 4. If not, repeat the above levelling steps until both platforms work
synchronously.
53.drive-on ramp
54.pin shaft
55. cotter pin
Содержание EE-6435BWF
Страница 33: ...Installation Operation and Parts Manual EE 6435BWF 33 Annex 1 Steel cable connection...
Страница 34: ...Installation Operation and Parts Manual EE 6435BWF 34 Annex 2 Electrical schemes and parts list...
Страница 35: ...Installation Operation and Parts Manual EE 6435BWF 35...
Страница 36: ...Installation Operation and Parts Manual EE 6435BWF 36...
Страница 37: ...Installation Operation and Parts Manual EE 6435BWF 37...
Страница 52: ...Installation Operation and Parts Manual EE 6435BWF 52...
Страница 53: ...Installation Operation and Parts Manual EE 6435BWF 53...