ENGLISH
37
1. GENERAL INSTALLATION INSTRUCTIONS
2. SAFETY AND USE INSTRUCTIONS
3. SOFTENER OPERATION
3.1. Operation mode
3.2. Regeneration mode
4. INSTALLATION
4.1. Installing a bypass system
c.1. Create a 3-valve bypass
c.2. Softener with integrated bypass
4.2. Installing the pressure-reducing valve
4.3. Connecting of wastewater and safety overflow pipes
4.4. Power supply
4.5. Special details
4.6. Salt tank connection
5. COMMISSIONING
6. RESIDUAL HARDNESS SETTING
7. SALT TO USE
8. FILTER PLACED ON THE WATER LINE
9. SHUTTING OFF THE SOFTENER
10. USING THE PROGRAMMER
10.1. Operation of the programmer
10.2. Setting the time
10.3. Special softener functions
10.3.1. Initiate an immediate regeneration
10.3.2. Holiday mode
10.4. Alarms (nACl + CALL)
10.4.1. nACL Alarm : salt
10.4.2. CALL Alarm : maintenance
11. WARRANTY
12. MAINTENANCE
13. TECHNICAL DATA
14. TECHNICAL DIAGRAM
15. TROUBLESHOOTING
38
38
39
39
39
39
41
41
41
42
43
43
43
44
44
44
45
45
45
45
45
46
46
46
46
46
46
46
47
47
48
49
51
TABLE OF CONTENTS
Содержание Station Vi100 Duo
Страница 2: ......
Страница 4: ......
Страница 5: ...FRANÇAIS NEDERLANDS ENGLISH 7 22 37 ...
Страница 6: ......