![DURAG D-R 290 Скачать руководство пользователя страница 81](http://html.mh-extra.com/html/durag/d-r-290/d-r-290_operating-manual_2541137081.webp)
5 | Installation
D-R 290
81
No.
LED
Behaviour
Function
1
Permanently lit during operation
Ready for operation
2
Lights up continuously when the measuring
head is in maintenance mode
Maintenance
Flashes at a 1-second interval (duty ratio
50/50) when the measuring head has a
warning / information in the memory
Warning
3
Flashes at a 1-second interval (duty ratio
50/50) when the measuring head has
saved a defect/failure
Failure
see section Faults
Flashes alternately green (4) when a de
fective DURAG Modbus bus frame has
been received
Data errors
4
Flashes when a DURAG Modbus frame is
received
DURAG Modbus
active
Flashes alternately red (3), when a defec
tive DURAG Modbus frame has been re
ceived (see above)
Data errors
1 green - 2 yellow - 3 red - 4 green
Table 5.3: Meaning of the LEDs and their flash codes
Configuration of the relay outputs
The contact settings of the relays (normally closed/normally open) on the D‑R 290 can
be configured.
Risk of contamination; perform the contamination check
If the D‑R 290 device casing is opened, the device together with the optical
components within it is no longer watertight and dust-tight. There is risk of
contamination of the optical components. If a particular degree of contamination is
exceeded, the device signals a defect condition and ceases to perform
measurements.
▶
Clean the device casing before opening it.
▶
Open the device only in a clean dry environment.
▶
Do not expose the opened device to the weather (rain, snow, sandstorms …).
Fig. 5.13: (LEDs in the meas
uring head)
5.4.7
Содержание D-R 290
Страница 12: ...12 D R 290 ...
Страница 18: ...1 General 18 D R 290 ...
Страница 20: ...20 D R 290 ...
Страница 28: ...2 Safety 28 D R 290 ...
Страница 30: ...30 D R 290 ...
Страница 38: ...3 Delivery 38 D R 290 ...
Страница 40: ...40 D R 290 ...
Страница 60: ...4 Product description 60 D R 290 ...
Страница 106: ...106 D R 290 ...
Страница 152: ...152 D R 290 ...
Страница 174: ...8 Maintenance 174 D R 290 ...
Страница 176: ...176 D R 290 ...
Страница 177: ...9 Appendix D R 290 177 Appendix Measurement point questionnaire Fig 9 1 Measurement point questionnaire 1 9 9 1 ...
Страница 178: ...9 Appendix 178 D R 290 Fig 9 2 Measurement point questionnaire 2 ...
Страница 188: ...9 Appendix 188 D R 290 Fig 9 11 Dimensional diagram D TB 100 supply unit Dimensional diagram purge air unit D BL 9 3 7 ...
Страница 193: ...9 Appendix D R 290 193 Fig 9 18 Dimensional diagram weather protection cover control electronics protective device ...
Страница 194: ...9 Appendix 194 D R 290 ...
Страница 200: ...11 Index 200 D R 290 ...
Страница 202: ...GmbH Kollaustraße 105 22453 Hamburg Germany www durag com ...