5 | Installation
D-R 290
65
Measuring head (main) connection
(power supply, measured data)
Mains power connection
DURAG Modbus
Customer interface
(e.g. analogue output, digital outputs, Modbus, Profibus …)
Connection by plug connector (otherwise a
fixed connection at the terminal strip, cable gland)
Purge air tube
PLS e.g. in a central control room
Fig. 5.1: System layout (example)
A
●
Standard system, one purge air unit,
●
locally installed* D−ISC 100 universal operation unit; from where data transfer to the
(cus
tomer's system) can be performed as required.
B
●
Minimum system, one purge air unit,
●
locally installed* D−TB 100 supply unit for power supply
●
Data transfer to the PLS (customer's system).
C
●
System with one purge air unit,
●
locally installed* D−TB 100 supply unit for power supply
●
central monitoring in e.g. a monitoring room (control room) by a D−ISC 100 universal operation unit
(data transmission from there by DURAG Modbus);
●
data transfer from the D−ISC 100 to the PLS (customer's system) can be performed as required
D
●
Standard system, two purge air units for systems with pitch circle diameter Ø 150 mm,
●
locally installed* D−ISC 100 universal operation unit; from where data transfer to the PLS (customer's
system) can be performed as required.
E
●
System with one purge air unit,
●
locally installed* D−TB 100 supply unit for power supply
●
central monitoring in e.g. a monitoring room (control room) by a D−ISC 100 universal operation unit
(data transmission from there by DURAG Modbus);
●
further measuring devices can be connected via DURAG Modbus to the same D−ISC 100,
●
data transfer from there to the PLS (customer's system) can be performed as required
* (cable length to measuring head ≤ 12 m)
Содержание D-R 290
Страница 12: ...12 D R 290 ...
Страница 18: ...1 General 18 D R 290 ...
Страница 20: ...20 D R 290 ...
Страница 28: ...2 Safety 28 D R 290 ...
Страница 30: ...30 D R 290 ...
Страница 38: ...3 Delivery 38 D R 290 ...
Страница 40: ...40 D R 290 ...
Страница 60: ...4 Product description 60 D R 290 ...
Страница 106: ...106 D R 290 ...
Страница 152: ...152 D R 290 ...
Страница 174: ...8 Maintenance 174 D R 290 ...
Страница 176: ...176 D R 290 ...
Страница 177: ...9 Appendix D R 290 177 Appendix Measurement point questionnaire Fig 9 1 Measurement point questionnaire 1 9 9 1 ...
Страница 178: ...9 Appendix 178 D R 290 Fig 9 2 Measurement point questionnaire 2 ...
Страница 188: ...9 Appendix 188 D R 290 Fig 9 11 Dimensional diagram D TB 100 supply unit Dimensional diagram purge air unit D BL 9 3 7 ...
Страница 193: ...9 Appendix D R 290 193 Fig 9 18 Dimensional diagram weather protection cover control electronics protective device ...
Страница 194: ...9 Appendix 194 D R 290 ...
Страница 200: ...11 Index 200 D R 290 ...
Страница 202: ...GmbH Kollaustraße 105 22453 Hamburg Germany www durag com ...