Step 1

By means of the plan you determine the layout of the 
clearance. Locate stakes A and B (in accordance with 
indicated dimensions) and make from there 2 circles 
for the clearance.

GROUND LEVELING

Step 2 

Clear and level the pool area in the clearance as indicat-
ed. For a firm ground it is better to remove high points 
than filling in low spots. Remove sods, stones, roots and 
other objects that could puncture the liner. The entire 
assembled pool framework must sit on flat ground. 

STAKES AND STRING LINES

Step  3 

Locate 4 stakes C, D, E and F in accordance with indi-
cated measures of the plan of your pool. Attach strings 
between C and D, then E and F. Now mark the assem-
bled side supports, as indicated on the plan. 

SIDE SUPPORT EXCAVATIONS

Step  4

Carefully dig out side support trenches following 
dimensions above. 

support width

centerline  

of pool

level tops

clearance radius

nail

stake

side area

level area

clearance 

radius

drill hole

level

5 x 10 cm leveling board

3,6 m wide pool = 2,45 m long

string line

string line

string line

string line locations

side support 

excavations 

(see step 4)

string line locations

Содержание SUNLAKE Series

Страница 1: ...A S S E M B L Y I N S T R U C T I O N S S U N L A K E O V A L P A G E 1 SUNLAKE OVAL POOLS ASSEMBLY INSTRUCTIONS...

Страница 2: ...y be damaged or cause personal injury 3 Do not attempt to lift the heavy boxes by yourself To reduce the possibility of personal injury have some one help you move heavy boxes pool wall liner etc WARN...

Страница 3: ...tlet for the pump 9 2 or 3 people for assistance during assembly 10 Do not build in case of strong wind 11 Walking space around your pool 60 cm 12 Put your pool on a level underground 13 In case of bu...

Страница 4: ...12 685 312 312 445 640 10 50 x 5 50m 266 488 555 302 pool radius clearance radius string line support clearance side support stake 61 122 122 122 61 272 266 555 266 266 399 550 POOL SIZES 6 10 x 3 60m...

Страница 5: ...e liner The entire assembled pool framework must sit on flat ground STAKES AND STRING LINES Step 3 Locate 4 stakes C D E and F in accordance with indi cated measures of the plan of your pool Attach st...

Страница 6: ...5 Place two concrete blocks into the excavations and place the assembled side supports into each trench perpendicular so that the front side of the side support is situated to the tautly wire POSITION...

Страница 7: ...pressure of the water DIG OUT FOR PRESSURE PADS Step 6 Remove dirt at the spot of the pressure pads so that the pressure pads can be assembled on the horizontal beams of the side support assemblies A...

Страница 8: ...of the side vertical assemblies with the end rails stamped with 12 When the bottom condition is not optimal place a patio block under every vertical end cap sunk on bottom level for extra certainty IN...

Страница 9: ...3 A Four screws connect the top rails with the vertical end caps Screw the screws in the right holes of the top rails and vertical end caps Follow the measures of the holes chart Holes with numbers 1...

Страница 10: ...ps Follow the measures of the holes chart Holes with numbers 1 and 3 are of the inside of the pool Holes with numbers 2 and 4 are of the outside of the pool INSTALL TOP RAILS HOLES CHART FOR TOP RAILS...

Страница 11: ...18 Hole 4 Top rail 28 28 28 C Hole 4 End cap C1 S1 C1 18 D B A C D D C A B D Figure 13D Joint C 5 50 Joint D 5 50 INSTALL TOP RAILS HOLES CHART FOR TOP RAILS SUNLAKE 10 50 X 5 50 Step 13d There are tw...

Страница 12: ...N L A K E O V A L P A G E 1 2 INSTALL TOP RAILS HOLES CHART FOR TOP RAILS SUNLAKE 12 50 X 6 40 Step 13e There are two different joints a straight and a round joint A B C straight D round see fig 13 E...

Страница 13: ...is achieved and re clamp the binder clips Remember that you are monitoring a minimum tightness of the liner over rail that will control the liner seating itself against the pool floor and up the side...

Страница 14: ...L COPING AND STABILIZER RAILS Step 20 Make a return hem as illustrated and smooth the liner against the wall see plan Place the coping over the liner and the stabilizer rails over the coping after pus...

Страница 15: ...be installed according to the installation ins truction delivered with the pool INSTALLATION OF SKIMMER AND INLET The skimmer and the inlet have to be installed before the pool is filled with water a...

Страница 16: ...sh it back If this is not possible you should lower the pressure to the pool wall by removing the mixture used to fill up the pool locally again so that the dent can be removed Then carefully fill up...

Страница 17: ...skimmer so that the foam side is facing the bottom 3 Install the top skimmer gasket 9 into the square opening of the metal wall make sure that the gas ket is positioned properly in front of the holes...

Страница 18: ...proper flexible hose provides the best suction results Attach the free end to the vacu um adaptor 13 2 Switch on the pump Keep the free end of the hose against the outlet of the inlet fixture Because...

Страница 19: ...ds or fingers 5 When the cover is in place you can switch on the pump and put into operation the suction of the pool floor 6 When you are finished suctioning you have to switch off the pump Remove the...

Страница 20: ...Do not remove the liner from your pool Upon removal of the liner of the pool the warrantee becomes void Do not pump dry all the water from the pool during the winter Leaks found Make sure that there a...

Отзывы: