A S S E M B L Y I N S T R U C T I O N S S U N L A K E - O V A L - P A G E 5
POOL LAYOUT
Step 1
By means of the plan you determine the layout of the
clearance. Locate stakes A and B (in accordance with
indicated dimensions) and make from there 2 circles
for the clearance.
GROUND LEVELING
Step 2
Clear and level the pool area in the clearance as indicat-
ed. For a firm ground it is better to remove high points
than filling in low spots. Remove sods, stones, roots and
other objects that could puncture the liner. The entire
assembled pool framework must sit on flat ground.
STAKES AND STRING LINES
Step 3
Locate 4 stakes C, D, E and F in accordance with indi-
cated measures of the plan of your pool. Attach strings
between C and D, then E and F. Now mark the assem-
bled side supports, as indicated on the plan.
SIDE SUPPORT EXCAVATIONS
Step 4
Carefully dig out side support trenches following
dimensions above.
support width
centerline
of pool
level tops
clearance radius
nail
stake
side area
level area
clearance
radius
drill hole
level
5 x 10 cm leveling board
3,6 m wide pool = 2,45 m long
string line
string line
string line
string line locations
side support
excavations
(see step 4)
string line locations