STEEL TOP RAIL / END SECTION
Legend for Figure B
Mounting end sections
1 = Covering panel
4 = Screws
5 = Stabilising rail (large)
6 = Stabilising rail (small)
7 = End cap
8 = Connector
9 = Cover
10 = Plastic profile
A S S E M B L Y I N S T R U C T I O N S S U N L A K E - O V A L - P A G E 9
INSTALL TOP RAILS + HOLES CHART
FOR TOP RAILS
(SUNLAKE
6,10 X 3,60 / 7,30 X 3,60)
Step 13a
There are two different joints, a straight and a round
joint. A, B, C straight / D round (see fig. 13 A).
Four screws connect the top rails with the vertical end
caps. Screw the screws in the right holes of the top rails
and vertical end caps.
Follow the measures of the holes chart.
Holes with numbers 1 and 3 are of the inside of the pool.
Holes with numbers 2 and 4 are of the outside of the
pool.
Figure B
11 = Bottom rail
17 = Screw
19 = Vertical
20 = Liner
28 = Wall
29 = Bolt
30 = Nut
31 = Protective strip
Joint A 3,60
Joint B 3,60
Hole chart for ovale pools
Joint A
Joint B
Hole 1 – Top Rail
C
C
Hole 1 – End cap
S3
12
Hole 2 – Top Rail
18/24
C
Hole 2 – End cap
S3
12
Hole 3 – Top Rail
C
C
Hole 3 – End cap
S3
12
Hole 4 – Top Rail
18/24
C
Hole 4 – End cap
S3
12
Figure 13A