background image

M O N T A G E   I N S T R U C T I E   C E N T U R Y   -   P A G I N A   1

A S S E M B L Y   I N S T R U C T I O N S   S U N L A K E   -   O V A L   -   P A G E   1 5

SUPPLEMENTARY INSTRUCTIONS 

FOR BUILDING A POOL IN THE 

GROUND

To avoid that material rolls onto the site where the pool 
is to be constructed, the location where the pool is to 
be constructed must be in the most elevated part of the 
garden. The surrounding landscape should be lower 
than the pool. Attention, the water level of the pool 
should also be above the groundwater level during the 
winter (water level 15 cm below the inlet).
The specific installation such as seen in Figure 2 serves 
only as a reference and is not representative for all pool 
installations. The parts which may need special materi-
als are the lighting and chloride installations.

EXCAVATING

1.  The circumference of the excavation is the same as 

the size of the pool plus 60 cm around the whole 
pool. Determine the size of the excavation pertaining 
to the size of the pool and use for this the exten-
sive installation instruction delivered with the pool. 
(Attention, the soil should be at least 15 cm white 
sand or stabilized sand; on top of that we recommend 
a layer of styrodur or a protective blanket.)

2.  The depth of the excavation is dependent on the 

height of the pool and desired terrace. Use the size 
such as seen in Figure 1 to calculate how deep the 
excavation should be.

3.  After the pool is excavated, the frame and the wall 

should be installed according to the installation ins-
truction delivered with the pool.

INSTALLATION OF SKIMMER AND INLET

The skimmer and the inlet have to be installed before 
the pool is filled with water and before the pool is filled 
up with stabilized sand. During the installation of the 
internal lining and the skimmer, the lead through for the 
skimmer may not be created yet. Install the inlet and 
gasket. Remove the internal lining from the inlet opening 
and install the valve delivered with the skimmer.

PLUMBER’S WORK

In order to prevent that the hoses move up and down, 
you should connect the skimmer and the inlet with rigid 
PVC to the filter (Figure 2). If you are using flexpipe, you 
need to make sure that this pipe is not bent, before you 
fill up the rest of the pool. Install the pump as closely as 
possible to the pool in connection with the drawing in of 
the pump. If this pump is a Doughboy Pool Powerpack, 
then you should place it below the water level.

FILLING THE POOL

First fill the pool with water up to approximately 5 cm 
away from the top edge. This procedure is absolutely 
necessary to absorb the pressure performed on the wall 
during the application of stabilized sand. Ff the pool 
is not filled completely with water, this can cause pool 
failure.

SHUTTERING

We recommend that you apply a shuttering around the 
skimmer before the pool is filled up.A space around the 
skimmer and any other accessories offer you the possi-

FIG. 1 - CONSTRUCTION PROVISIONS WHEN A POOL IS EXCAVATED

Figure 2

Specific installation

Cover panel

60 cm working space 

around the pool

Fill the pool up to 5 cm below the top edge

Grade 

(2 cm per meter)

12-15 cm 

Содержание SUNLAKE Series

Страница 1: ...A S S E M B L Y I N S T R U C T I O N S S U N L A K E O V A L P A G E 1 SUNLAKE OVAL POOLS ASSEMBLY INSTRUCTIONS...

Страница 2: ...y be damaged or cause personal injury 3 Do not attempt to lift the heavy boxes by yourself To reduce the possibility of personal injury have some one help you move heavy boxes pool wall liner etc WARN...

Страница 3: ...tlet for the pump 9 2 or 3 people for assistance during assembly 10 Do not build in case of strong wind 11 Walking space around your pool 60 cm 12 Put your pool on a level underground 13 In case of bu...

Страница 4: ...12 685 312 312 445 640 10 50 x 5 50m 266 488 555 302 pool radius clearance radius string line support clearance side support stake 61 122 122 122 61 272 266 555 266 266 399 550 POOL SIZES 6 10 x 3 60m...

Страница 5: ...e liner The entire assembled pool framework must sit on flat ground STAKES AND STRING LINES Step 3 Locate 4 stakes C D E and F in accordance with indi cated measures of the plan of your pool Attach st...

Страница 6: ...5 Place two concrete blocks into the excavations and place the assembled side supports into each trench perpendicular so that the front side of the side support is situated to the tautly wire POSITION...

Страница 7: ...pressure of the water DIG OUT FOR PRESSURE PADS Step 6 Remove dirt at the spot of the pressure pads so that the pressure pads can be assembled on the horizontal beams of the side support assemblies A...

Страница 8: ...of the side vertical assemblies with the end rails stamped with 12 When the bottom condition is not optimal place a patio block under every vertical end cap sunk on bottom level for extra certainty IN...

Страница 9: ...3 A Four screws connect the top rails with the vertical end caps Screw the screws in the right holes of the top rails and vertical end caps Follow the measures of the holes chart Holes with numbers 1...

Страница 10: ...ps Follow the measures of the holes chart Holes with numbers 1 and 3 are of the inside of the pool Holes with numbers 2 and 4 are of the outside of the pool INSTALL TOP RAILS HOLES CHART FOR TOP RAILS...

Страница 11: ...18 Hole 4 Top rail 28 28 28 C Hole 4 End cap C1 S1 C1 18 D B A C D D C A B D Figure 13D Joint C 5 50 Joint D 5 50 INSTALL TOP RAILS HOLES CHART FOR TOP RAILS SUNLAKE 10 50 X 5 50 Step 13d There are tw...

Страница 12: ...N L A K E O V A L P A G E 1 2 INSTALL TOP RAILS HOLES CHART FOR TOP RAILS SUNLAKE 12 50 X 6 40 Step 13e There are two different joints a straight and a round joint A B C straight D round see fig 13 E...

Страница 13: ...is achieved and re clamp the binder clips Remember that you are monitoring a minimum tightness of the liner over rail that will control the liner seating itself against the pool floor and up the side...

Страница 14: ...L COPING AND STABILIZER RAILS Step 20 Make a return hem as illustrated and smooth the liner against the wall see plan Place the coping over the liner and the stabilizer rails over the coping after pus...

Страница 15: ...be installed according to the installation ins truction delivered with the pool INSTALLATION OF SKIMMER AND INLET The skimmer and the inlet have to be installed before the pool is filled with water a...

Страница 16: ...sh it back If this is not possible you should lower the pressure to the pool wall by removing the mixture used to fill up the pool locally again so that the dent can be removed Then carefully fill up...

Страница 17: ...skimmer so that the foam side is facing the bottom 3 Install the top skimmer gasket 9 into the square opening of the metal wall make sure that the gas ket is positioned properly in front of the holes...

Страница 18: ...proper flexible hose provides the best suction results Attach the free end to the vacu um adaptor 13 2 Switch on the pump Keep the free end of the hose against the outlet of the inlet fixture Because...

Страница 19: ...ds or fingers 5 When the cover is in place you can switch on the pump and put into operation the suction of the pool floor 6 When you are finished suctioning you have to switch off the pump Remove the...

Страница 20: ...Do not remove the liner from your pool Upon removal of the liner of the pool the warrantee becomes void Do not pump dry all the water from the pool during the winter Leaks found Make sure that there a...

Отзывы: