For the installation of any type of gas, the installer must be authorised by the Ministry of Industry
and strictly follow the applicable Gas Regulations.
The gas connection must be made using a rigid pipe with a shut-off valve. The gas pipe diameter is
not determined by the boiler connection. It should be calculated in accordance with its length and
consequently its pressure drop.
Lastly, it must be checked that it correctly sealed against any gas leaks.
4.5
4.5
4.5
4.5
Electric con
Electric con
Electric con
Electric connections
nections
nections
nections
The module is equipped for connection at 230 V, 50 Hz to terminals 1 and 2 of terminal strip
J1
J1
J1
J1
(see
"
Electrical Connection Diagram
").
Make sur
Make sur
Make sur
Make sure that the a
e that the a
e that the a
e that the app
pp
pp
pplia
lia
lia
liance i
nce i
nce i
nce is gro
s gro
s gro
s grou
u
u
unded.
nded.
nded.
nded.
In addition, for the correct operation of the
Fusion Hybrid Gas Condens
Fusion Hybrid Gas Condens
Fusion Hybrid Gas Condens
Fusion Hybrid Gas Condens
, it is also necessary to
connect the heat pump to the power supply as indicated in the section “
Connection to the general
power supply
” of the
DUAL CLIMA
DUAL CLIMA
DUAL CLIMA
DUAL CLIMA
heat pump manual.
DANGER
DANGER
DANGER
DANGER
When
When
When
When handling the electrical installation, make sure that both the module and the
handling the electrical installation, make sure that both the module and the
handling the electrical installation, make sure that both the module and the
handling the electrical installation, make sure that both the module and the Dual Clima
Dual Clima
Dual Clima
Dual Clima
he
he
he
heat p
at p
at p
at pu
u
u
ump are disconnected from
mp are disconnected from
mp are disconnected from
mp are disconnected from the mains
the mains
the mains
the mains....
The
Fusion Hybrid Gas Condens
Fusion Hybrid Gas Condens
Fusion Hybrid Gas Condens
Fusion Hybrid Gas Condens
module features a series of motorised diverting valves and DHW
and Heating support activation signals that are sensed by the
DUAL C
DUAL C
DUAL C
DUAL CLIMA
LIMA
LIMA
LIMA
heat pump. To do this,
electrical cables with a minimum section of 0.5 mm
2
must be passed from the terminal strip of the
DU
DU
DU
DUAL CLIMA
AL CLIMA
AL CLIMA
AL CLIMA
heat pump to the inside of the
Fusion Hybrid Gas Condens
Fusion Hybrid Gas Condens
Fusion Hybrid Gas Condens
Fusion Hybrid Gas Condens
module. The module has
a series of cable glands at the rear, through which it is possible to insert these cables into the
equipment.
The electrical connection of these signals will be carried out between the general terminal strip of
the heat pump and the terminal strip of the module, by opening the door and removing the front
cover of the internal control panel to access it. The following figure describes how to connect all
the signals necessary for correct operation.
First, it is necessary to remove the jumpers in the room thermostat connection of the
DUAL CLIMA
DUAL CLIMA
DUAL CLIMA
DUAL CLIMA
heat pump.
E1L
E1L
E1L
E1L
E2L
E2L
E2L
E2L E2N
E2N
E2N
E2N C4L
C4L
C4L
C4L N
N
N
N C6L
C6L
C6L
C6L LLLL G1S
G1S
G1S
G1S G3S
G3S
G3S
G3S
H
H
H
H C
C
C
COM
OM
OM
OM
N
N
N
N
C
C
C
C
E1N
E1N
E1N
E1N
Once the jumpers have been removed, all the connections specified in the following diagram must
be made.