background image

www.LifeIonizers.com

9

75

DOLPHIN

To Place Tank in Service

 

After all plumbing is finished (including the back wash 

drain line) restore water pressure to home while the 

unit bypass valve is still in the “by-pass” position. This 

will enable you to insure there are no leaks in the piping 

before adding water to the tank.

INITIAL RINSE: Do not run water in any part of the 

house during the initial rinse procedure

Next, plug in unit to a nearby 110V/ac outlet. 

(See page 14 

for “QUICK SET UP GUIDE”)

Initiate the backwash on the valve by depressing the 

Extra Cycle            button for 3-5 seconds. 

The valve will cycle into the back wash position cycle 

#1 and begin counting down the minutes remaining in 

cycle 1. Next slowly open only the inlet valve knob of 

the by-pass valve, only to 1/3rd the way open, so that 

the water may 

SLOWLY

 fill the tank.  This procedure 

allows the media to hydrate slowly and will take about 

15 minutes.  You will observe air, water and carbon fines 

coming from the drain line.

Immediately after opening the inlet valve 1/3rd of the 

way unplug the valve from the wall socket so the unit 

will remain in cycle #1 (1st backwash) until it is plugged 

back in. If you leave it plugged in it will automatically 

move to the next cycle before the filter media is prop-

erly hydrated.

Содержание THE DOLPHIN

Страница 1: ......

Страница 2: ......

Страница 3: ...out Back Flush To Place Tank in Bypass Automactic Backwash Valve Quick Set Up Basic Operations To Set Time of Day When Did the Last Backwash Occur To Initiate an Extra Backwash Cycle To Set Backwash F...

Страница 4: ...to installation You will need either an 1 or MPT adaptor to hook up the pipes to the bypass Your Automatic valve will plug into any standard 110V power socket The automatic valve has an internal comp...

Страница 5: ...well water systems the filter should be located after the pressure tank and before the water heater The filter is to be installed on the COLD water line only Allow 15 feet minimum of piping length bet...

Страница 6: ...t to plug into and a drain access for the back wash drain line capable of handling a flow of up to 5 GPM The back wash drain line can consist of either pipe or semi rigid hose and must allow an unrest...

Страница 7: ...valve onto the tank until you can feel the first threads click over each other then screw valve onto tank Use caution to keep the valve straight while lowering onto the riser tube By keeping the valve...

Страница 8: ...uring the installation process position the filter where you want it installed then measure and modify piping as required DO NOT APPLY HEAT TO ANY FITTINGS CONNECTED TO THE FILTER BYPASS VALVE Heat wi...

Страница 9: ...g the Extra Cycle button for 3 5 seconds The valve will cycle into the back wash position cycle 1 and begin counting down the minutes remaining in cycle 1 Next slowly open only the inlet valve knob of...

Страница 10: ...iodic backwash cycle takes place Should you have a water system with high water pressure it is recommended to install our optional 5 Micron Sediment Filter Part 7504 after your Dolphin Whole Home Filt...

Страница 11: ...example For healthy clean water it is recommended you have your water tested annually Consult your Life Ionizer s Water Professional for details 888 688 8889 sales lifeionizers com A Word About Filte...

Страница 12: ...ffing action which takes place will not remove adsorbed organic material since the bonding process is not distributed by backwashing 4 The fluffing process backwash is controlled by the backwash assem...

Страница 13: ...nobs into the bypass posi tion and call your water dealer The two knobs are located directly behind your automatic valve where your cold water pipes enter the unit The knobs will only rotate 90o from...

Страница 14: ...ill indicate which cycle is in operation A RED status light illuminates when there is an error condition For normal day to day valve operation you will see the Blue light and the LED time of day windo...

Страница 15: ...n you first press the D you will get an indication of when the last backwash occurred Pressing the after first pressing the D will indicate the pre vious backwash Pressing the D a second time will put...

Страница 16: ...ch backwash and also to set the time of day that the back wash will take place you will need to press BOTH the up AND the down arrows AT THE SAME TIME for 3 5 seconds until the screen changes You will...

Страница 17: ...amage the bypass valve Note Placing the bypass valve into the bypass position will bypass both the filter tank and filter valve The water entering the home will no longer be filtered Placing the valve...

Страница 18: ...ounter and Undercounder Drinking Water Systems Water Optimizers Bottled Water Dispenser System Eco Friendly Anti Scale System Reverse Osmosis Sytems Pre and Replacement Filters LIFE Ionizers 6352 Cort...

Страница 19: ...t in your house make sure to set at different intervals to prevent lack of water pressure in your home Name Time of Day Backwash Frequency Unit ____________ ______________ ______________ Unit ________...

Страница 20: ......

Отзывы: