PR95 Operator’s Manual
Prepare - 31
Inspect Site
CMW
Inspect Site
Inspect jobsite before transporting equipment. Check for the following:
Inspect jobsite before transporting equipment. Check for the following:
•
changes in elevation such as hills or open trenches
•
obstacles such as buildings, railroad crossings, or streams
•
signs of utilities
– “buried utility” notices
– utility facilities without overhead lines
– gas or water meters
– junction boxes
– drop boxes
– light poles
– manhole covers
– sunken ground
•
traffic
•
access
•
soil type and condition
•
depths of existing pipes
Содержание PR95
Страница 1: ...PR95 Operator s Manual 053 1102 Issue 1 0 CMW...
Страница 19: ...Safety 18 PR95 Operator s Manual Emergency Procedures CMW...
Страница 39: ...Prepare 38 PR95 Operator s Manual Check Supplies and Prepare Equipment CMW...
Страница 40: ...PR95 Operator s Manual Transport 39 CMW Transport Chapter Contents Lift 40 Points 40 Procedure 40...
Страница 51: ...Burst Pipe 50 PR95 Operator s Manual Pull Pipe CMW...
Страница 57: ...Systems and Equipment 56 PR95 Operator s Manual Accessory Kit CMW...
Страница 92: ......
Страница 93: ......
Страница 94: ...PR95 Operator s Manual Service Record 93 CMW Service Record Service Performed Date Hours...
Страница 95: ...Service Record 94 PR95 Operator s Manual CMW Service Performed Date Hours...