PR95 Operator’s Manual
Burst Pipe - 45
Prepare System
CMW
6.
Connect electrical cables.
•
Connector 1 is for stationary emergency
stop
•
Connector 2 is for remote emergency stop
•
Connector 3 is for remote bursting unit
control
7.
Connect ground rod to bursting unit.
8.
Drive ground rod into soil at front of pit.
Содержание PR95
Страница 1: ...PR95 Operator s Manual 053 1102 Issue 1 0 CMW...
Страница 19: ...Safety 18 PR95 Operator s Manual Emergency Procedures CMW...
Страница 39: ...Prepare 38 PR95 Operator s Manual Check Supplies and Prepare Equipment CMW...
Страница 40: ...PR95 Operator s Manual Transport 39 CMW Transport Chapter Contents Lift 40 Points 40 Procedure 40...
Страница 51: ...Burst Pipe 50 PR95 Operator s Manual Pull Pipe CMW...
Страница 57: ...Systems and Equipment 56 PR95 Operator s Manual Accessory Kit CMW...
Страница 92: ......
Страница 93: ......
Страница 94: ...PR95 Operator s Manual Service Record 93 CMW Service Record Service Performed Date Hours...
Страница 95: ...Service Record 94 PR95 Operator s Manual CMW Service Performed Date Hours...