PR95 Operator’s
Manual
Service - 77
As Needed
CMW
As Needed
Bursting Unit
Repair Jaw Threads
Remove Jaws
1.
Remove covers (shown).
2.
Put bursting unit into manual mode and move
cylinders until pin bolt hole is aligned with hole.
3.
Open jaws slightly.
Location
Task
Notes
BURSTING
UNIT
Repair jaw threads
POWER
UNIT
Change air filter
Adjust fan belt tension
Содержание PR95
Страница 1: ...PR95 Operator s Manual 053 1102 Issue 1 0 CMW...
Страница 19: ...Safety 18 PR95 Operator s Manual Emergency Procedures CMW...
Страница 39: ...Prepare 38 PR95 Operator s Manual Check Supplies and Prepare Equipment CMW...
Страница 40: ...PR95 Operator s Manual Transport 39 CMW Transport Chapter Contents Lift 40 Points 40 Procedure 40...
Страница 51: ...Burst Pipe 50 PR95 Operator s Manual Pull Pipe CMW...
Страница 57: ...Systems and Equipment 56 PR95 Operator s Manual Accessory Kit CMW...
Страница 92: ......
Страница 93: ......
Страница 94: ...PR95 Operator s Manual Service Record 93 CMW Service Record Service Performed Date Hours...
Страница 95: ...Service Record 94 PR95 Operator s Manual CMW Service Performed Date Hours...