Burst Pipe - 48
PR95 Operator’s Manual
Pull Pipe
CMW
Pull Pipe
1.
Push bursting unit away from pit wall slightly.
2.
Slide pulling brace (shown) into position.
Ensure brace is flush with pit wall.
3.
Put bursting unit into pull mode.
4.
Enable brake.
5.
Pull back rod.
6.
Unthread and place in rod box.
7.
Continue pulling back rods until towing
assembly reaches burster pit.
Содержание PR95
Страница 1: ...PR95 Operator s Manual 053 1102 Issue 1 0 CMW...
Страница 19: ...Safety 18 PR95 Operator s Manual Emergency Procedures CMW...
Страница 39: ...Prepare 38 PR95 Operator s Manual Check Supplies and Prepare Equipment CMW...
Страница 40: ...PR95 Operator s Manual Transport 39 CMW Transport Chapter Contents Lift 40 Points 40 Procedure 40...
Страница 51: ...Burst Pipe 50 PR95 Operator s Manual Pull Pipe CMW...
Страница 57: ...Systems and Equipment 56 PR95 Operator s Manual Accessory Kit CMW...
Страница 92: ......
Страница 93: ......
Страница 94: ...PR95 Operator s Manual Service Record 93 CMW Service Record Service Performed Date Hours...
Страница 95: ...Service Record 94 PR95 Operator s Manual CMW Service Performed Date Hours...