Burst Pipe - 44
PR95 Operator’s Manual
Prepare System
CMW
Prepare System
1.
Unload bursting unit, power unit and rod boxes
next to burster pit.
2.
Connect hydraulic hoses to power unit.
•
Hoses 1, 2, 3 and 5 are from bursting unit.
•
Hoses 4 and 6 are from rod makeup device.
3.
Tighten hoses fully.
4.
Lower bursting unit into pit. Use boards to ensure rods will be level with existing pipe.
5.
Place end of rod makeup device arm into hole
on end of rear of bursting unit.
IMPORTANT:
•
Ensure connectors are clean before
threading hoses onto connectors.
•
Each connector is a different size and
will only attach to the same-sized
connector.
•
Connect hose 5 first and work up to
hose 1 for easy access.
Содержание PR95
Страница 1: ...PR95 Operator s Manual 053 1102 Issue 1 0 CMW...
Страница 19: ...Safety 18 PR95 Operator s Manual Emergency Procedures CMW...
Страница 39: ...Prepare 38 PR95 Operator s Manual Check Supplies and Prepare Equipment CMW...
Страница 40: ...PR95 Operator s Manual Transport 39 CMW Transport Chapter Contents Lift 40 Points 40 Procedure 40...
Страница 51: ...Burst Pipe 50 PR95 Operator s Manual Pull Pipe CMW...
Страница 57: ...Systems and Equipment 56 PR95 Operator s Manual Accessory Kit CMW...
Страница 92: ......
Страница 93: ......
Страница 94: ...PR95 Operator s Manual Service Record 93 CMW Service Record Service Performed Date Hours...
Страница 95: ...Service Record 94 PR95 Operator s Manual CMW Service Performed Date Hours...