Burst Pipe - 46
PR95 Operator’s Manual
Push Rods
CMW
Push Rods
1.
Start power unit engine.
2.
Assemble pilot rod. See “Pilot Rods” on page 52.
3.
Disable brake.
4.
Thread 2-3 rods together.
5.
Put bursting unit into push mode and push rod string into existing pipe.
6.
Thread next rod onto rod string loosely.
7.
Swing rod makeup device into position and place collar onto end of rod.
8.
Thread onto pipe loosely.
9.
Turn rotation speed/direction control to right.
10. Press engage switch until rods thread together completely.
11. Move rod makeup device clear of rod.
12. Push rod into pipe.
13. Continue threading rods together and pushing into pipe until pilot assembly enters exit pit.
IMPORTANT:
If bursting unit or rod makeup device does not work,
•
Ensure all emergency stops are connected and disengaged.
•
Check all hydraulic and electrical connections.
IMPORTANT:
Spray lubricant (such as WD-40) on threads of each rod every use.
Содержание PR95
Страница 1: ...PR95 Operator s Manual 053 1102 Issue 1 0 CMW...
Страница 19: ...Safety 18 PR95 Operator s Manual Emergency Procedures CMW...
Страница 39: ...Prepare 38 PR95 Operator s Manual Check Supplies and Prepare Equipment CMW...
Страница 40: ...PR95 Operator s Manual Transport 39 CMW Transport Chapter Contents Lift 40 Points 40 Procedure 40...
Страница 51: ...Burst Pipe 50 PR95 Operator s Manual Pull Pipe CMW...
Страница 57: ...Systems and Equipment 56 PR95 Operator s Manual Accessory Kit CMW...
Страница 92: ......
Страница 93: ......
Страница 94: ...PR95 Operator s Manual Service Record 93 CMW Service Record Service Performed Date Hours...
Страница 95: ...Service Record 94 PR95 Operator s Manual CMW Service Performed Date Hours...