PR95 Operator’s Manual
Burst Pipe - 47
Connect
CMW
Connect
1.
Install towing head (2) onto end of new pipe
(1).
2.
Remove pilot rod assembly.
3.
Install bursting head (5) over rod (6) and slide
forward until threads are visible.
4.
Thread stop rod assembly (4) on end of rod
string.
5.
Connect stop rod assembly to towing head
with a shackle (3).
Содержание PR95
Страница 1: ...PR95 Operator s Manual 053 1102 Issue 1 0 CMW...
Страница 19: ...Safety 18 PR95 Operator s Manual Emergency Procedures CMW...
Страница 39: ...Prepare 38 PR95 Operator s Manual Check Supplies and Prepare Equipment CMW...
Страница 40: ...PR95 Operator s Manual Transport 39 CMW Transport Chapter Contents Lift 40 Points 40 Procedure 40...
Страница 51: ...Burst Pipe 50 PR95 Operator s Manual Pull Pipe CMW...
Страница 57: ...Systems and Equipment 56 PR95 Operator s Manual Accessory Kit CMW...
Страница 92: ......
Страница 93: ......
Страница 94: ...PR95 Operator s Manual Service Record 93 CMW Service Record Service Performed Date Hours...
Страница 95: ...Service Record 94 PR95 Operator s Manual CMW Service Performed Date Hours...